AIR SWITCHING VALVE(for Bank 1) INSPECTION

PROCEDURE


  1. INSPECT NO. 1 EMISSION CONTROL VALVE SET


    1. A01X33HE02
      Text in Illustration
      *a

      Component without harness connected

      (No. 1 Emission Control Valve Set)

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 5 20°C (68°F) 4.5 to 5.5 Ω
      1 - Body ground Always 1 MΩ or higher
      5 - Body ground

      Tech Tips


      • When measuring the resistance, do not touch terminals 2, 3 or 4.

      • When measuring the resistance, make sure that the surface temperature of the No. 1 emission control valve set is 20°C (68°F).

      If the result is not as specified, replace the No. 1 emission control valve set.

    2. A01XB6IE02
      Text in Illustration
      *1 Port A
      *2 Port B
      B001XPG Air

      Check the operation of the No. 1 emission control valve set.


      1. Check that air does not flow from port A to port B.

        Note

        Make sure the applied pressure is 30 kPa (0.3 kgf/cm2, 4.4 psi) or less.

        If the result is not as specified, replace the No. 1 emission control valve set.

      2. A01XBE6E02
        Text in Illustration
        *1 Port A
        *2 Port B
        *a

        Component without harness connected

        (No. 1 Emission Control Valve Set)

        B001XPG Air

        Apply battery voltage across terminals 1 and 5.

        Note

        When applying voltage, do not touch terminals 2, 3 or 4.

      3. Check that air flows from port A to port B.

        If the result is not as specified, replace the No. 1 emission control valve set.