Click here

AIR SWITCHING VALVE(for Bank 1) REMOVAL

Click here
Click here

PROCEDURE


  1. Click here

    REMOVE V-BANK COVER

    Click here

  2. Click here

    REMOVE AIR CLEANER CAP AND HOSE

    Click here

  3. Click here

    REMOVE AIR TUBE


    1. B001YBU

      Remove the 2 bolts, 2 nuts and air tube.

    2. Remove the 2 gaskets.

      Note:

      Be careful not to damage the installation surface of the gaskets.

  4. Click here

    REMOVE NO. 1 EMISSION CONTROL VALVE SET


    1. B001Z6O

      Disconnect the No. 1 emission control valve set connector.

    2. Disconnect the No. 1 air hose from the No. 1 emission control valve set.

    3. B00204G

      Remove the 3 nuts and No. 1 emission control valve set.