PROCEDURE
CONNECT NO. 7 WATER BY-PASS HOSE
| *1 | Marking |
Connect the water by-pass hose to the fuel cooler.
Tech Tips
Align the alignment marks and connect the hose.
Align the pinching portion of the clamp with the hose alignment mark and connect the hose.
INSTALL FUEL COOLER ASSEMBLY
Install the fuel cooler with the 2 bolts.
CONNECT NO. 3 FUEL HOSE
Connect the fuel hose to the fuel cooler.
Tech Tips
Align the alignment marks and connect the hose.
Align the pinching portion of the clamp with the hose alignment mark and connect the hose.
CONNECT NO. 6 WATER BY-PASS HOSE
INSTALL NO. 4 NOZZLE LEAKAGE PIPE
INSTALL NO. 3 NOZZLE LEAKAGE PIPE
INSTALL EGR COOLER INSULATOR (w/ EGR System)
INSTALL EGR VALVE ASSEMBLY WITH EGR COOLER (w/ EGR System)
INSTALL EGR PIPE INSULATOR (w/ EGR System)
INSTALL INTAKE MANIFOLD INSULATOR (w/ EGR System)
INSTALL NO. 3 INTAKE MANIFOLD
CONNECT NO. 2 ENGINE WIRE
INSTALL INTAKE PIPE
INSTALL NO. 2 INTAKE MANIFOLD INSULATOR (w/ Intercooler)
INSTALL NO. 1 INTAKE MANIFOLD INSULATOR (w/ Intercooler)
INSTALL COMMON RAIL ASSEMBLY LH AND RH