ROOF HEADLINING REASSEMBLY

PROCEDURE


  1. INSTALL NO. 2 ROOF SILENCER PAD (w/o Sliding Roof)


    1. Align the markings on the roof headlining assembly with the 2 No. 2 roof silencer pads and install the pads using hot-melt glue as shown in the illustration.

      B001KK8E01
      Text in Illustration
      *a 5 mm (0.197 in.) *b Marking
  2. INSTALL NO. 2 ROOF SILENCER PAD (w/ Sliding Roof)


    1. Align the markings on the roof headlining assembly with the No. 2 roof silencer pad and install the pad using hot-melt glue as shown in the illustration.

      B001KNFE01
      Text in Illustration
      *a 5 mm (0.197 in.) *b Marking
  3. INSTALL NO. 4 ROOF SILENCER PAD (w/o Sliding Roof)


    1. Align the markings on the roof headlining assembly with the No. 4 roof silencer pad and install the pad using hot-melt glue as shown in the illustration.

      B001MPGE01
      Text in Illustration
      *a 5 mm (0.197 in.) *b Marking
  4. INSTALL NO. 3 ROOF SILENCER PAD (w/o Sliding Roof)


    1. Align the markings on the roof headlining assembly with the No. 3 roof silencer pad and install the pad using hot-melt glue as shown in the illustration.

      B001KXYE01
      Text in Illustration
      *a 5 mm (0.197 in.) *b Marking
  5. INSTALL NO. 1 ROOF SILENCER PAD (w/o Sliding Roof)


    1. Align the markings on the roof headlining assembly with the No. 1 roof silencer pad and install the pad using hot-melt glue as shown in the illustration.

      B001LCZE01
      Text in Illustration
      *a 5 mm (0.197 in.) *b Marking
  6. INSTALL NO. 1 ROOF WIRE


    1. Apply double-sided tape as shown in the illustration.

    2. Peel off the release paper from the double-sided tape.

    3. Attach the No. 1 roof wire along the double-sided tape so that the marking surface of the wire harness faces downward.

      B001LG1E01
      Text in Illustration
      *A Tape Attachment Locations (Reference) *B w/o Sliding Roof
      *C w/ Sliding Roof - -
      *1 Double-sided Tape - -
      *a Marking - -
      Double-sided Tape Size
      X
      1 mm (0.0394 in.)
      Y
      15 mm (0.591 in.)
      Z
      20 mm (0.787 in.)
    4. Align the pink marking tape (A) on the front part of the No. 1 roof wire with the front tab of the roof headlining assembly.

      B001NARE03
      Text in Illustration
      *A w/o Sliding Roof *B w/ Sliding Roof
      *C w/ EC Mirror *D w/ Rain Sensor (for LHD), w/ Humidity Sensor (for RHD)
      *E w/ Humidity Sensor (for LHD), w/ Rain Sensor (for RHD) - -
      *1 Joint Box - -
      *a Marking *b Adjustment Area
    5. Align the joint box with the roof headlining marking, and secure it using the tape.

    6. Align the pink marking tape (B) on the No. 1 roof wire with the markings on the roof headlining assembly.

    7. Attach the No. 1 roof wire, starting from the front tab of the roof headlining assembly to the pink marking tape (B) while aligning it with the double-sided tape.

      Note


      • Securely attach the No. 1 roof wire.

      • If any of the No. 1 roof wire is left loose, this will cause abnormal noise. Make sure to attach the No. 1 roof wire without leaving any loose.

    8. Engage each clamp.

    9. Attach the No. 1 roof wire, starting from the pink marking tape (B) to the visor connector RH part while aligning it with the double-sided tape.

      Note


      • Securely attach the No. 1 roof wire.

      • If any of the No. 1 roof wire is left loose, this will cause abnormal noise. Make sure to attach the No. 1 roof wire without leaving any loose.

    10. Turn the visor connector RH clockwise approximately 90° to install the connector to the roof headlining assembly.

    11. Turn the visor connector LH clockwise approximately 90° to install the connector to the roof headlining assembly.

    12. Attach the No. 1 roof wire, starting from the joint box to the adjustment area while aligning it with the double-sided tape.

      Note


      • Securely attach the No. 1 roof wire.

      • If any of the No. 1 roof wire is left loose, this will cause abnormal noise. Make sure to attach the No. 1 roof wire without leaving any loose.

    13. Align the pink marking tape (C) on the No. 1 roof wire with the markings on the roof headlining assembly.

    14. Attach the No. 1 roof wire, starting from the pink marking tape (C) to the adjustment area while aligning it with the double-sided tape.

      Note


      • Securely attach the No. 1 roof wire.

      • If any of the No. 1 roof wire is left loose, this will cause abnormal noise. Make sure to attach the No. 1 roof wire without leaving any loose.

      Tech Tips

      Secure the extra length of the No. 1 roof wire in the adjustment area.

    15. Apply adhesive tape by aligning it with the markings on the roof headlining.

      B001KF1E03
      Text in Illustration
      *A Tape Attachment Locations (Reference) *B w/o Sliding Roof
      *C w/ Sliding Roof *D w/ EC Mirror
      *E w/ Rain Sensor (for LHD), w/ Humidity Sensor (for RHD) *F w/ Humidity Sensor (for LHD), w/ Rain Sensor (for RHD)
      *1 Adhesive Tape - -
      *a Marking - -
      Adhesive Tape Size
      X
      20 mm (0.787 in.)
      Y
      100 mm (3.94 in.)
  7. INSTALL NO. 2 ANTENNA CORD SUB-ASSEMBLY

    Click here

  8. INSTALL VANITY LIGHT ASSEMBLY


    1. Install the vanity light assembly Click here.

      Tech Tips

      Use the same procedure for the other vanity light.