FRONT BLOWER MOTOR INSTALLATION

PROCEDURE


  1. INSTALL FRONT BLOWER MOTOR SUB-ASSEMBLY (w/o PTC Heater)


    1. Install the front blower motor sub-assembly with the 3 screws.

      Note

      Do not reuse the front blower motor sub-assembly if it has been damaged or received an impact.

    2. Engage the clamp and connect the connector.

  2. INSTALL FRONT BLOWER MOTOR SUB-ASSEMBLY (w/ PTC Heater)


    1. Install the front blower motor sub-assembly with the 3 screws.

      Note

      Do not reuse the front blower motor sub-assembly if it has been damaged or received an impact.

    2. Install the quick heater connector screw.

    3. Reattach the felt tape.

    4. Engage the clamp and connect the connector.

  3. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for LHD)

    Click here

  4. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for RHD)

    Click here