PROCEDURE
INSTALL DOUBLE LOCK DOOR CONTROL RELAY ASSEMBLY
Install the double lock door control relay assembly with the bolt.
INSTALL RADIO TUNER OPENING COVER WITH BRACKET (w/o Radio Receiver)
INSTALL RADIO RECEIVER ASSEMBLY WITH BRACKET
INSTALL AIR CONDITIONING CONTROL ASSEMBLY
INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY
INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH
INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH
INSTALL LOWER CENTER INSTRUMENT PANEL FINISH PANEL
INSTALL NO. 3 INSTRUMENT CLUSTER FINISH PANEL GARNISH (for Metal Finish Panel and Urethane Panel)
INSTALL NO. 3 INSTRUMENT CLUSTER FINISH PANEL GARNISH (for Wood Panel and Bamboo Panel)
INSTALL INSTRUMENT SIDE PANEL
INSTALL FRONT DOOR OPENING TRIM WEATHERSTRIP
for LHD: Click here
for RHD: Click here
INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE
INSTALL DECK FLOOR BOX RH
INSTALL REAR NO. 3 FLOOR BOARD
INSTALL REAR DECK FLOOR BOX
INSTALL REAR NO. 2 FLOOR BOARD
CONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.