PROCEDURE
INSTALL NO. 1 INTEGRATION RELAY
Connect the 3 connectors.
Engage the 2 claws to install the No. 1 integration relay as shown in the illustration.
INSTALL NO. 1 RELAY BLOCK COVER
Engage the 3 claws to install the No. 1 relay block cover as shown in the illustration.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.
INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE
INSTALL DECK FLOOR BOX RH
INSTALL REAR NO. 3 FLOOR BOARD
INSTALL REAR DECK FLOOR BOX
INSTALL REAR NO. 2 FLOOR BOARD