SHIFT LEVER INSTALLATION

PROCEDURE


  1. INSTALL TRANSMISSION INSTRUMENT PANEL SHIFT ASSEMBLY


    1. Connect the 2 connectors to transmission instrument panel shift assembly.

    2. Install the transmission instrument panel shift assembly with the 3 nuts.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
  2. INSTALL CONSOLE BOX LH (for LHD)

    Click here

  3. INSTALL CONSOLE BOX RH (for RHD)

    Click here

  4. INSTALL CONSOLE BOX INSERT

    Click here

  5. INSTALL REAR CONSOLE BOX ASSEMBLY

    Click here

  6. INSTALL CONSOLE BOX CARPET

    Click here

  7. INSTALL REAR CONSOLE BOX POCKET

    Click here

  8. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY

    Click here

  9. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY

    Click here

  10. INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH

    Click here

  11. INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH

    Click here

  12. INSTALL LOWER CENTER INSTRUMENT PANEL FINISH PANEL

    Click here

  13. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY

    Click here

  14. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  15. INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE

    Click here

  16. INSTALL DECK FLOOR BOX RH

    Click here

  17. INSTALL REAR NO. 3 FLOOR BOARD

    Click here

  18. INSTALL REAR DECK FLOOR BOX

    Click here

  19. INSTALL REAR NO. 2 FLOOR BOARD

    Click here

  20. INSPECT SHIFT LEVER


    1. Turn the power switch on (READY).

    2. Check that all available shift positions can be selected by moving the shift lever.

      Tech Tips

      After the transmission instrument panel shift assembly is replaced with a new one, perform the above operation. If this operation is not performed, moving the shift lever may not initially select shift positions.