PROCEDURE
INSTALL MOTOR CABLE
Note
Wear insulated gloves.
Install the motor cable to the hybrid transaxle assembly with the 3 bolts.
Note
Keep the sealing surface of the motor cable and the connector terminal joint free of foreign matter.
Engage the 2 claws to install a new terminal cap.
Note
When installing the terminal cap to the motor cable terminal block, keep the sealing surface free of foreign matter.
Place the motor cable connector shell in position and install it with the 2 bolts.
Connect the 3 clamps.
INSTALL INVERTER TRAY BRACKET (for 2ZR-FXE)
INSTALL INVERTER TRAY BRACKET (for 5ZR-FXE)
INSTALL INVERTER RESERVE TANK ASSEMBLY (for 2ZR-FXE)
INSTALL INVERTER RESERVE TANK ASSEMBLY (for 5ZR-FXE)
INSTALL INVERTER WITH CONVERTER ASSEMBLY
CONNECT WATER HOSE
CONNECT NO. 2 ENGINE ROOM WIRE
REMOVE INVERTER COVER
CONNECT NO. 2 ENGINE WIRE
CONNECT MOTOR CABLE
CONNECT GENERATOR CABLE
CONNECT FRAME WIRE
CHECK HIGH VOLTAGE CABLE CONNECTION
INSTALL INVERTER COVER
INSTALL ENGINE ROOM MAIN WIRE
INSTALL NO. 1 INVERTER BRACKET
INSTALL SERVICE PLUG GRIP
CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.
INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE
INSTALL DECK FLOOR BOX RH
INSTALL REAR NO. 3 FLOOR BOARD
INSTALL REAR DECK FLOOR BOX
INSTALL REAR NO. 2 FLOOR BOARD
ADD COOLANT (for Inverter)
INSPECT FOR COOLANT LEAK (for Inverter)
INSTALL RADIATOR SUPPORT OPENING COVER
INSTALL INVERTER COVER ASSEMBLY LH (w/ Cover)
INSTALL NO. 1 ENGINE UNDER COVER (for 2ZR-FXE)
INSTALL NO. 1 ENGINE UNDER COVER (for 5ZR-FXE)
INSTALL FRONT LOWER BUMPER ABSORBER (for 2ZR-FXE)
INSTALL FRONT LOWER BUMPER ABSORBER (for 5ZR-FXE)