POWER SWITCH INSTALLATION

PROCEDURE


  1. INSTALL POWER SWITCH


    1. Engage the 2 claws to install the power switch.

  2. INSTALL METER HOOD SUB-ASSEMBLY

    Click here

  3. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL


    1. Connect the negative auxiliary battery cable with the nut.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }

      Note

      When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  4. INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE

    Click here

  5. INSTALL DECK FLOOR BOX RH

    Click here

  6. INSTALL REAR NO. 3 FLOOR BOARD

    Click here

  7. INSTALL REAR DECK FLOOR BOX

    Click here

  8. INSTALL REAR NO. 2 FLOOR BOARD

    Click here