PCV VALVE INSTALLATION

PROCEDURE


  1. INSTALL VENTILATION VALVE SUB-ASSEMBLY


    1. Apply adhesive to 2 or 3 threads of the ventilation valve sub-assembly.

      Adhesive
      Toyota genuine adhesive 1324, three bond 1324 or equivalent
    2. Using a ball joint lock nut wrench (22 mm), install the ventilation valve sub-assembly.

      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }

      Note

      Use the torque value compensation formula to calculate the torque value for use when a torque wrench is combined with a tool such as a ball joint lock nut wrench Click here.

    3. Install the ventilation hose to the ventilation valve sub-assembly.

  2. INSTALL NO. 1 ENGINE UNDER COVER

  3. INSTALL AIR CLEANER CASE

    Click here

  4. INSTALL INLET AIR CLEANER ASSEMBLY

    Click here

  5. INSTALL WATER HOSE HOSE CLAMP

    Click here

  6. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

    Click here

  7. INSTALL NO. 2 CYLINDER HEAD COVER

    Click here