FRONT CRANKSHAFT OIL SEAL INSTALLATION

PROCEDURE


  1. INSTALL TIMING CHAIN COVER OIL SEAL


    1. Apply MP grease to the lip of a new oil seal.

      Note

      Keep the lip free from foreign matter.

    2. A004VD8E01

      Using SST and a hammer, tap in the oil seal until its surface is flush with the front oil seal retainer edge.

      SST
      09223-22010

      Note


      • Wipe any extra grease off of the crankshaft.

      • Do not tap the oil seal at an angle.

  2. INSTALL CRANKSHAFT PULLEY


    1. Align the pulley set key with the key groove of the pulley.

    2. Install the crankshaft pulley to the crankshaft.

    3. A004W8NE03
      Text in Illustration
      *a Hold
      *b Turn

      Using SST, hold the pulley in place and tighten the bolt.

      SST
      09213-58014   ( 91551-80840 )
      09330-00021
      Torque:
      190 N*m  { 1937 kgf*cm, 140 ft.*lbf }
  3. INSTALL REAR SIDE RAIL REINFORCEMENT SUB-ASSEMBLY RH

    Click here

  4. INSTALL FRONT WHEEL RH

    Torque:
    103 N*m  { 1050 kgf*cm, 76 ft.*lbf }
  5. INSPECT FOR OIL LEAK

  6. INSTALL REAR ENGINE UNDER COVER RH