COMBINATION SWITCH INSTALLATION

PROCEDURE


  1. INSTALL COMBINATION SWITCH ASSEMBLY


    1. Engage the 2 claws to install the transmission shift main switch.

    2. B001MSG

      Put the 2 guides in position.

    3. Install the position indicator housing assembly to the combination switch assembly with the 2 screws.

      Torque:
      0.8 N*m  { 8 kgf*cm, 7 in.*lbf }
    4. Connect each connector.

    5. Engage the clamp.

    6. Engage the 2 guides and 6 claws to install the combination switch assembly.

  2. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY

    Click here

  3. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY

    Click here

  4. INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH

    Click here

  5. INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH

    Click here

  6. INSTALL LOWER CENTER INSTRUMENT PANEL FINISH PANEL

    Click here

  7. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  8. INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE

    Click here

  9. INSTALL DECK FLOOR BOX RH

    Click here

  10. INSTALL REAR NO. 3 FLOOR BOARD

    Click here

  11. INSTALL REAR DECK FLOOR BOX

    Click here

  12. INSTALL REAR NO. 2 FLOOR BOARD

    Click here