ECM INSTALLATION

PROCEDURE


  1. INSTALL ECM


    1. Install the 2 ECM brackets to the ECM with the 4 screws.

    2. Install the ECM with the 2 bolts.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
    3. Connect the 2 ECM connectors.


      1. B001MQP

        Connect the 2 ECM connectors and lower the 2 levers.

        Note


        • When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.

        • Make sure that the 2 levers are securely locked.

      2. Install the wire harness clamp.

  2. INSTALL INVERTER RESERVE TANK ASSEMBLY


    1. Install the inverter reserve tank assembly with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  3. INSTALL INVERTER WITH CONVERTER ASSEMBLY

    Click here

  4. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  5. INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE

    Click here

  6. INSTALL DECK FLOOR BOX RH

    Click here

  7. INSTALL REAR NO. 3 FLOOR BOARD

    Click here

  8. INSTALL REAR DECK FLOOR BOX

    Click here

  9. INSTALL REAR NO. 2 FLOOR BOARD

    Click here

  10. PERFORM INITIALIZATION

    Note


    • Perform Initialization when replacing the ECM Click here.

    • When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.