FRONT STABILIZER BAR(for AWD) INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips

A bolt without a torque specification is shown in the standard bolt chart Click here.

PROCEDURE


  1. INSTALL FRONT NO. 1 STABILIZER BAR BUSH


    1. A001ACNE01
      *1 Front Side
      *2 Bush Stopper
      *3 Upper Side
      *4 Seam

      Install the 2 front No. 1 stabilizer bar bushes outside of the bush stoppers on the front stabilizer bar as shown in the illustration.

      Note

      Make sure to face the front No. 1 stabilizer bar bush's seam to the lower rear of the vehicle.

  2. TEMPORARILY INSTALL FRONT STABILIZER BAR

    A001F5PE01
    *1 Vehicle Top
    *2 Vehicle Frontside

    1. Temporarily install the front stabilizer bar and front No. 1 stabilizer bracket LH and RH with the 4 bolts in the direction shown in the illustration.

  3. INSTALL FRONT NO. 1 STABILIZER BRACKET LH

    A0019E8

    1. Install the front No. 1 stabilizer bracket LH with the 2 bolts.

      Torque:
      115 N*m  { 1173 kgf*cm, 85 ft.*lbf }
    2. Install the wire harness bracket with the bolt.

      Torque:
      22 N*m  { 224 kgf*cm, 16 ft.*lbf }
  4. INSTALL FRONT NO. 1 STABILIZER BRACKET RH


    1. A001CKN

      Install the front No. 1 stabilizer bracket RH with the 2 bolts.

      Torque:
      115 N*m  { 1173 kgf*cm, 85 ft.*lbf }
  5. INSTALL FRONT STABILIZER LINK ASSEMBLY LH

    A001F3B

    1. Install the front stabilizer link with the 2 nuts.

      Torque:
      85 N*m  { 867 kgf*cm, 63 ft.*lbf }

      Tech Tips

      If the ball joint turns together with the nut, use a 6 mm hexagon wrench to hold the stud bolt.

  6. INSTALL FRONT STABILIZER LINK ASSEMBLY RH

    Tech Tips

    Install the RH side following the same procedures as the LH side.

  7. INSTALL FRONT LOWER SUSPENSION MEMBER PROTECTOR

    Click here

  8. INSTALL NO. 1 ENGINE UNDER COVER

    Click here

  9. INSTALL FRONT WHEEL OPENING EXTENSION PAD LH

    Click here

  10. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH

    Click here

  11. INSTALL NO. 2 ENGINE UNDER COVER

    Click here

  12. INSTALL FRONT CENTER FLOOR COVER

    Click here