CONTROL VALVE ASSEMBLY(for Front Side) INSTALLATION

PROCEDURE


  1. INSTALL NO. 1 HEIGHT CONTROL VALVE SUB-ASSEMBLY


    1. A0019T4

      Install the height control valve with the 2 nuts.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    2. A001BXM

      Connect the 3 side air tubes Click here.

    3. A001C6W

      Connect the underside air tube Click here.

    4. Connect the connector.

  2. INSPECT FOR AIR LEAK

    Click here

  3. INSTALL FRONT BUMPER COVER

    Click here