CAMSHAFT OIL CONTROL VALVE INSTALLATION

PROCEDURE


  1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)


    1. Apply a light coat of engine oil to a new O-ring, and install it to the camshaft timing oil control valve assembly.

    2. A001912

      Install the camshaft timing oil control valve assembly with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Note


      • Do not allow foreign matter to contact the oil seal face of the camshaft timing oil control valve assembly (connecting surface with cylinder head cover).

      • Be careful that the O-ring is not cracked or moved out of place when installing the camshaft timing oil control valve assembly.

    3. Connect the camshaft timing oil control valve assembly connector.

  2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2)


    1. Apply a light coat of engine oil to a new O-ring, and install it to the camshaft timing oil control valve assembly.

    2. A001AV3

      Install the camshaft timing oil control valve assembly with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Note


      • Do not allow foreign matter to contact the oil seal face of the camshaft timing oil control valve assembly (connecting surface with cylinder head cover).

      • Be careful that the O-ring is not cracked or moved out of place when installing the camshaft timing oil control valve assembly.

    3. Connect the camshaft timing oil control valve assembly connector.

  3. INSTALL NO. 1 AIR CLEANER INLET

    Click here

  4. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY

    Click here

  5. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here

  6. DRIVING TEST


    1. After the engine is warmed up, perform the driving test. Then check that the oil control valve operates normally.