PURGE VALVE INSTALLATION

PROCEDURE


  1. INSTALL PURGE VSV


    1. A0019M0

      Install the purge VSV with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. Connect the 2 purge line hoses to the purge VSV.

    3. Connect the purge VSV connector.

  2. CONNECT ENGINE WIRE (for LHD)

    Click here

  3. CONNECT ENGINE WIRE (for RHD)

    Click here

  4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY LH

    Click here

  5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY RH

    Click here

  6. INSTALL INTAKE AIR CONNECTOR PIPE

    Click here

  7. INSTALL NO. 1 AIR CLEANER INLET

    Click here

  8. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here

  9. INSTALL ENGINE ROOM SIDE COVER LH

    Click here

  10. INSTALL ENGINE ROOM SIDE COVER RH

    Click here

  11. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY

    Click here