PURGE VALVE REMOVAL

PROCEDURE


  1. REMOVE AIR CLEANER INLET COVER SUB-ASSEMBLY

    Click here

  2. REMOVE ENGINE ROOM SIDE COVER LH

    Click here

  3. REMOVE ENGINE ROOM SIDE COVER RH

    Click here

  4. REMOVE V-BANK COVER SUB-ASSEMBLY

    Click here

  5. REMOVE NO. 1 AIR CLEANER INLET

    Click here

  6. REMOVE INTAKE AIR CONNECTOR PIPE

    Click here

  7. REMOVE AIR CLEANER CAP SUB-ASSEMBLY LH

    Click here

  8. REMOVE AIR CLEANER CAP SUB-ASSEMBLY RH

    Click here

  9. DISCONNECT ENGINE WIRE (for LHD)

    Click here

  10. DISCONNECT ENGINE WIRE (for RHD)

    Click here

  11. REMOVE PURGE VSV

    A0019M0

    1. Disconnect the purge VSV connector.

    2. Disconnect the 2 purge line hoses from the purge VSV.

    3. Remove the bolt and purge VSV.