VALVE BODY ASSEMBLY INSPECTION

PROCEDURE


  1. INSPECT SHIFT SOLENOID VALVE SL1

    A00196LE01
    *a Component without harness connected: (Shift Solenoid Valve SL1)

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) with a 21 W bulb → Terminal 2

      Battery negative (-) → Terminal 1

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  2. INSPECT SHIFT SOLENOID VALVE SL2

    A00196LE02
    *a Component without harness connected: (Shift Solenoid Valve SL2)

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) with a 21 W bulb → Terminal 2

      Battery negative (-) → Terminal 1

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  3. INSPECT SHIFT SOLENOID VALVE SL3

    A00196LE03
    *a Component without harness connected: (Shift Solenoid Valve SL3)

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) with a 21 W bulb → Terminal 2

      Battery negative (-) → Terminal 1

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  4. INSPECT SHIFT SOLENOID VALVE SL4

    A00196LE04
    *a Component without harness connected: (Shift Solenoid Valve SL4)

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) with a 21 W bulb → Terminal 2

      Battery negative (-) → Terminal 1

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  5. INSPECT SHIFT SOLENOID VALVE SL5

    A00196LE05
    *a Component without harness connected: (Shift Solenoid Valve SL5)

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Measure the resistance according to the value(s) in the table below.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) with a 21 W bulb → Terminal 2

      Battery negative (-) → Terminal 1

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  6. INSPECT SHIFT SOLENOID VALVE SL

    A001FVSE03
    *1 Shift Solenoid Valve SL

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve connector - Shift solenoid valve body 20°C (68°F) 11 to 15 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) → Shift solenoid valve connector

      Battery negative (-) → Shift solenoid valve body

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  7. INSPECT SHIFT SOLENOID VALVE SLU

    A00196LE06
    *a Component without harness connected: (Shift Solenoid Valve SLU)

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) with a 21 W bulb → Terminal 1

      Battery negative (-) → Terminal 2

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  8. INSPECT SHIFT SOLENOID VALVE SLT

    A00196LE07
    *a Component without harness connected: (Shift Solenoid Valve SLT)

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) with a 21 W bulb → Terminal 2

      Battery negative (-) → Terminal 1

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  9. INSPECT SHIFT SOLENOID VALVE SR

    A001F3VE01
    *1 Shift Solenoid Valve SR

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve connector - Shift solenoid valve body 20°C (68°F) 11 to 15 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) → Shift solenoid valve connector

      Battery negative (-) → Shift solenoid valve body

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.