PARK / NEUTRAL POSITION SWITCH ADJUSTMENT

PROCEDURE


  1. ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY

    A001BONE01
    *1 Neutral Basic Line
    *2 Groove

    1. Loosen the park/neutral position switch bolt and move the shift lever to N.

    2. Align the neutral basic line with the switch groove.

    3. Hold the switch in position and tighten the bolt.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
    4. After adjustment, perform the inspection Click here.