Click here

КОРПУС КЛАПАНОВ В СБОРЕ ПРОВЕРКА

Click here
Click here
  1. Click here

    INSPECT SHIFT SOLENOID VALVE S1


    1. A003F6RE04

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve S1 connector terminal - Shift solenoid valve S1 body 20°C (68°F) 11 to 15 Ω
      Table 1. Text in Illustration
      *a Shift Solenoid Valve S1
    2. Connect a positive (+) lead from battery to the terminal of the shift solenoid valve S1 connector, and a negative (-) lead to the shift solenoid valve S1 body, and check the operation of the valve.

      OK
      The valve moves and makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve S1.

  2. Click here

    INSPECT SHIFT SOLENOID VALVE S2


    1. A003HOYE01

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve S2 connector terminal - Shift solenoid valve S2 body 20°C (68°F) 11 to 15 Ω
      Table 2. Text in Illustration
      *a Shift Solenoid Valve S2
    2. Connect a positive (+) lead from battery to the terminal of the shift solenoid valve S2 connector, and a negative (-) lead to the shift solenoid valve S2 body, and check the operation of the valve.

      OK
      The valve moves and makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve S2.

  3. Click here

    INSPECT SHIFT SOLENOID VALVE SLT


    1. A003AYVE23

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
      Table 3. Text in Illustration
      *a

      Component without harness connected

      (Shift Solenoid Valve SLT)

    2. Connect the positive (+) lead with a 21 W bulb from the battery to terminal 2 and the negative (-) lead to terminal 1 of the shift solenoid valve SLT connector and check the operation of the valve.

      OK
      The valve moves and makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve SLT.

  4. Click here

    INSPECT SHIFT SOLENOID VALVE SL


    1. w/o Flex Lock-up:


      1. A003C1VE01

        Measure the resistance according to the value(s) in the table below.

        Standard Resistance
        Tester Connection Condition Specified Condition
        Shift solenoid valve SL connector terminal - Shift solenoid valve SL body 20°C (68°F) 11 to 15 Ω
        Table 4. Text in Illustration
        *a Shift Solenoid Valve SL
      2. Connect a positive (+) lead from battery to the terminal of the shift solenoid valve SL connector, and a negative (-) lead to the shift solenoid valve SL body, and check the operation of the valve.

        OK
        The valve moves and makes an operating sound.

        If the result is not as specified, replace the shift solenoid valve SL.

  5. Click here

    INSPECT SHIFT SOLENOID VALVE SLU


    1. w/ Flex Lock-up:


      1. A003GIVE01

        Measure the resistance according to the value(s) in the table below.

        Standard Resistance
        Tester Connection Condition Specified Condition
        1 - 2 20°C (68°F) 5.1 to 5.5 Ω
        Table 5. Text in Illustration
        *a

        Component without harness connected

        (Shift Solenoid Valve SLU)

      2. Connect the positive (+) lead with a 21 W bulb from the battery to terminal 1 and the negative (-) lead to terminal 2 of the shift solenoid valve SLU connector and check the operation of the valve.

        OK
        The valve moves and makes an operating sound.

        If the result is not as specified, replace the shift solenoid valve SLU.