СВЕЧА НАКАЛИВАНИЯ УСТАНОВКА


  1. INSTALL GLOW PLUG


    1. Using a deep socket wrench (12 mm), install the 4 glow plugs.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
  2. INSTALL GLOW PLUG NO.1 CONNECTOR


    1. Install the glow plug No.1 connectors with the 4 nuts.

      Torque:
      2.2 N*m  { 22 kgf*cm, 16 in.*lbf }
    2. Install the 4 grommets.

  3. INSTALL INTAKE MANIFOLD


    1. A003H3Z

      Install a new gasket and the intake manifold with the 4 bolts and 2 nuts.

      Torque:
      29 N*m  { 296 kgf*cm, 21 ft.*lbf }
    2. Install the manifold stay with the bolt and nut.

      Torque:
      19 N*m  { 194 kgf*cm, 14 ft.*lbf }
    3. Connect the ground cable with the bolt.

  4. INSTALL NOZZLE LEAKAGE PIPE ASSEMBLY NO.2


    1. Временно установите трубопровод обратного слива топлива и закрепите его 2 болтами.

    2. A003CK1

      Установите новую прокладку и пустотелый соединительный болт-штуцер на трубопровод обратного слива топлива.

      Torque:
      21 Н*м  { 214 кгс*см, 15 фунт-сила-футов }
    3. A003DRM

      Затяните 2 болта.

      Torque:
      13 Н*м  { 133 кгс*см, 10 фунт-сила-футов }
  5. INSTALL FUEL INLET PIPE SUB-ASSEMBLY

    Note


    • When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket, or timing gear case with a new one, replace the fuel inlet pipe.

    • Be careful not to adhere dusts, dirt or any other materials onto the joint area of the fuel inlet pipe.


    1. Temporarily install the fuel inlet pipe.

    2. Using SST, tighten the injection pipe on the common rail side.

      SST
      09023-12701
      Torque:
      32 N*m  { 326 kgf*cm, 24 ft.*lbf, for use with SST }
    3. Using SST, tighten the injection pipe on the supply pump side.

      SST
      09023-12701
      Torque:
      32 N*m  { 326 kgf*cm, 24 ft.*lbf, for use with SST }
  6. INSTALL INJECTION PIPE

    SST
    09023-12701

    Note


    • When replacing the fuel injector, common rail, or cylinder head with a new one, replace injection pipes No. 1, No. 2, No. 3, and No. 4.

    • Keep clean the joint of the injection pipe.


    1. Install the injection pipes.


      1. A003E87

        Temporarily install the 4 injection pipes.

      2. A003C95

        Install the injection pipe clamp No.3 in 2 nuts.

        Torque:
        5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
      3. A003E87E01

        Fasten the union sequentially, from the injection pipe common rail to the injector, using SST.

        SST
        09023-12701
        Torque:
        Use union nut wrench and torque wrench
        32 N*m  { 326 kgf*cm, 24 ft.*lbf }
  7. INSTALL OIL LEVEL GAUGE GUIDE


    1. Установите на трубку щупа проверки уровня масла новое уплотнительное кольцо.

    2. Нанесите на уплотнительное кольцо тонкий слой моторного масла.

    3. Установите трубку щупа проверки уровня масла и закрепите ее болтом.

      Torque:
      8,0 Н*м  { 82 кгс*см, 71 фунт-сила-дюйм }
    4. Установите щуп проверки уровня масла.

  8. INSTALL INTAKE AIR CONNECTOR (w/o EGR Valve)


    1. A003G45E01

      Temporarily install 2 new gaskets and intake air connector No.2 to the intake air connector.

    2. A003EYQ

      Temporarily tighten the intake air connector assembly with the bolt and 2 nuts.

    3. Tighten the manifold stay with the bolt.

    4. Tighten the intake air connector with the bolt and 2 nuts.

    5. Install the vacuum hose to the intake air connector.

  9. INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY (w/ EGR Valve)


    1. Temporarily tighten the EGR valve assembly with the sensor.


      1. A003DG5E01

        Install 2 new gaskets and the EGR valve to the intake air connector as shown in the illustration.

      2. A003HC0

        Temporarily tighten the intake air connector with EGR valve assembly to the intake manifold with the bolt and the 2 nuts.

      3. Install the vacuum hose to the intake air connector.

      4. Temporarily tighten the manifold stay with the bolt.

      5. A003H5T

        Connect the EGR valve position sensor connector.

      6. Connect the intake air temperature sensor connector.

    2. Install the vacuum regulating valve.


      1. A003BEQ

        Install the vacuum regulating valve with the 2 bolts.

        Torque:
        20 N*m  { 204 kgf*cm, 15 ft.*lbf }
      2. Connect the 2 vacuum hoses and the regulating valve connector.

  10. INSTALL ENGINE SERVICE HOLE COVER NO.2


    1. Install the engine service hole cover No.2 with the 3 bolts.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
    2. A003CDS

      Return the carpet.

  11. INSTALL EGR PIPE SUB-ASSEMBLY NO.1 (w/ EGR Valve)


    1. A003BF9

      Install 2 new gaskets to the cylinder head and the EGR pipe sub-assembly No.1 as shown in the illustration.

    2. A003CG8

      Install the EGR pipe with the 2 bolts and the 2 nuts.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
    3. A003BPA

      Connect the fuel pressure sensor connector.

  12. INSTALL DIESEL THROTTLE BODY ASSEMBLY

    Note

    After removing and installing, or replacing the throttle body, be sure to perform the operation check.


    1. Install a new gasket to intake air connector.

    2. A003F09

      Install the throttle body with the 2 bolts and the 2 nuts.

      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
    3. A003BFR

      Connect the 2 throttle body connectors.

  13. INSTALL AIR HOSE NO.4


    1. A003DQ1

      Install the air hose No.4 with the 2 clamps.

      Torque:
      6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
  14. CONNECT OIL RETURN HOSE (w/ Inter Cooler)


    1. A003ICN

      Connect the oil return hose with the clip.

  15. INSTALL VANE PUMP OIL RESERVOIR ASSEMBLY


    1. A003E43E01

      Установите масляный бачок лопастного насоса в сборе и закрепите 2 болтами.

      Torque:
      8,0 Н*м  { 82 кгс*см, 71 фунт-сила-дюйм }
  16. INSTALL ENGINE SERVICE HOLE SUB COVER ASSEMBLY


    1. Установите вспомогательную крышку технологического отверстия двигателя и закрепите ее 5 болтами.

      Torque:
      13 Н*м  { 133 кгс*см, 10 фунт-сила-футов }
  17. INSTALL FRONT DOOR SCUFF PLATE RH

  18. INSTALL FRONT SEAT ASSEMBLY RH (for Hi-back Seat Type)


    1. Perform the same procedure as above on the opposite side. Click here

  19. INSTALL FRONT SEAT ASSEMBLY RH (for Low-back Seat Type)


    1. Perform the same procedure as above on the opposite side. Click here

  20. CONNECT NEGATIVE BATTERY CABLE

  21. INSPECT FUEL LEAK


    1. PERFORM ACTIVE TEST


      1. Connect the GTS to the DLC3.

      2. Turn the ignition switch on.

      3. Turn the GTS on.

      4. Enter the following menus: Powertrain / Engine and ECT / Active Test.

      5. Perform the Active Test.

        Tester Display Test Details Control Range Diagnostic Notes
        Test the Fuel Leak Pressurizes common rail internal fuel pressure, and checks for fuel leaks Stop/Start
        • Fuel pressure inside common rail pressurized to specified value and engine speed increased to 2,000 rpm when ON is selected

        • Above conditions preserved while test is ON

  22. INSPECT FUNCTION OF THROTTLE BODY


    1. Inspect the throttle control motor.


      1. A003AM7

        Using an ohmmeter, measure the resistance between the terminals.

        Standard resistance
        Tester Connection Specified Condition
        1 (DUTY) - Body ground Infinity
  23. PERFORM INITIALIZATION


    1. Some system need initialization when reconnecting the battery cable. Click here