Click here

КЛАПАН ПРИНУДИТЕЛЬНОЙ ВЕНТИЛЯЦИИ КАРТЕРА ПРОВЕРКА

Click here
Click here
  1. Click here

    INSPECT PCV VALVE SUB-ASSEMBLY


    1. Install a clean hose to the PCV valve sub-assembly.

    2. Check the PCV valve sub-assembly operation.


      1. A003EUAE03

        Blow air into the cylinder head side, and check that air passes through easily.

        Table 1. Text in Illustration
        *a Clean Hose
        A003DCD Air
        CAUTION:

        Do not suck air through the valve. Petroleum substances inside the valve are hazardous to your health.

      2. A003CT3E03

        Blow air into the intake manifold side, and check that air passes through with difficulty.

        Table 2. Text in Illustration
        *a Clean Hose
        A003DCD Air

        If the result is not as specified, replace the PCV valve sub-assembly.

    3. Remove the clean hose from the PCV valve sub-assembly.