FUEL TEMPERATURE SENSOR INSTALLATION


  1. INSTALL FUEL TEMPERATURE SENSOR


    1. A003HB1E01

      Apply a light coat of light oil to a new O-ring.

    2. Install the O-ring to the fuel temperature sensor.

    3. Using the SST, install the fuel temperature sensor.

      SST
      09922-10010
      Torque:
      22 N*m  { 220 kgf*cm, 16 ft.*lbf }
  2. INSTALL INJECTION OR SUPPLY PUMP ASSEMBLY


    1. A003ICG

      Confirm that the supply pump gear in the timing gear case moves back and forth smoothly.

    2. Install a new O-ring and the pulley key to the supply pump.

    3. Aligning the projecting edge of the supply pump head to the key-slot of the supply pump gear, install the pump to the timing gear case.

    4. While holding the supply pump by hand, push the supply pump gear rearward to engage the pump gear and drive shaft.

    5. Temporarily install the supply pump with the 2 nuts.

    6. A003CTS

      Using SST, hold the crankshaft.

      SST
      09213-58013
      09330-00021
    7. Install the supply pump gear set nut.

      Tech Tips

      Set a new O-ring before tightening the supply pump gear set nut.

      Torque:
      64 N*m  { 653 kgf*cm, 47 ft.*lbf }
    8. A003CSO

      Temporarily install the supply pump stay with the 2 bolts on the engine block side.

    9. Tighten the 2 nuts for the injection pump.

      Torque:
      21 N*m  { 214 kgf*cm, 16 ft.*lbf }
    10. A003GEB

      Install the camshaft timing pulley flange No.2 and pump drive shaft pulley with the 4 bolts.

      Torque:
      31 N*m  { 316 kgf*cm, 23 ft.*lbf }
  3. CHECK PUMP DRIVE SHAFT THRUST CLEARANCE


    1. A003C2L

      Push the pump drive shaft pulley back and forth to check a thrust clearance of the injection pump drive shaft.

      Thrust clearance
      0.15 to 0.55 mm (0.0059 to 0.0217 in.)

      Note

      Make sure that the crankshaft pulley's notch is at 30 degree in the counterclockwise direction form the TDC position.

      Tech Tips

      If there is not thrust clearance, disassemble and reassemble the injection pump and pump drive shaft pulley.

  4. INSTALL FUEL INLET PIPE SUB-ASSEMBLY

    Note


    • When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket, or timing gear case with a new one, replace the fuel inlet pipe.

    • Be careful not to adhere dusts, dirt or any other materials onto the joint area of the fuel inlet pipe.


    1. Temporarily install the fuel inlet pipe.

    2. Using SST, tighten the injection pipe on the common rail side.

      SST
      09023-12701
      Torque:
      32 N*m  { 326 kgf*cm, 24 ft.*lbf, for use with SST }
    3. Using SST, tighten the injection pipe on the supply pump side.

      SST
      09023-12701
      Torque:
      32 N*m  { 326 kgf*cm, 24 ft.*lbf, for use with SST }
  5. INSTALL INJECTION PIPE

    SST
    09023-12701

    Note


    • When replacing the fuel injector, common rail, or cylinder head with a new one, replace injection pipes No. 1, No. 2, No. 3, and No. 4.

    • Keep clean the joint of the injection pipe.


    1. Install the injection pipes.


      1. A003E87

        Temporarily install the 4 injection pipes.

      2. A003C95

        Install the injection pipe clamp No.3 in 2 nuts.

        Torque:
        5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
      3. A003E87E01

        Fasten the union sequentially, from the injection pipe common rail to the injector, using SST.

        SST
        09023-12701
        Torque:
        Use union nut wrench and torque wrench
        32 N*m  { 326 kgf*cm, 24 ft.*lbf }
  6. INSTALL OIL LEVEL GAGE GUIDE


    1. Install a new O-ring to the oil level gauge guide.

    2. Apply a light coat of engine oil to the O-ring.

    3. Install the oil level gauge guide with the bolt.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    4. Install the oil level gauge.

  7. CONNECT INTAKE AIR CONNECTOR (w/o EGR Valve)


    1. A003G45E01

      Temporarily install 2 new gaskets and intake air connector No.2 to the intake air connector.

    2. A003EYQ

      Temporarily tighten the intake air connector assembly with the bolt and 2 nuts.

    3. Tighten the manifold stay with the bolt.

    4. Tighten the intake air connector with the bolt and 2 nuts.

    5. Install the vacuum hose to the intake air connector.

  8. TEMPORARILY TIGHTEN ELECTRIC EGR CONTROL VALVE ASSEMBLY (w/ EGR Valve)


    1. Temporarily tighten the EGR valve assembly with the sensor.


      1. A003DG5E01

        Install 2 new gaskets and the EGR valve to the intake air connector as shown in the illustration.

      2. A003HC0

        Temporarily tighten the intake air connector with EGR valve assembly to the intake manifold with the bolt and the 2 nuts.

      3. Install the vacuum hose to the intake air connector.

      4. Temporarily tighten the manifold stay with the bolt.

      5. A003H5T

        Connect the EGR valve position sensor connector.

      6. Connect the intake air temperature sensor connector.

    2. Install the vacuum regulating valve.


      1. A003BEQ

        Install the vacuum regulating valve with the 2 bolts.

        Torque:
        20 N*m  { 204 kgf*cm, 15 ft.*lbf }
      2. Connect the 2 vacuum hoses and the regulating valve connector.

  9. INSTALL EGR PIPE SUB-ASSEMBLY NO.1 (w/ EGR Valve)


    1. A003BF9

      Install the 2 gaskets to the cylinder head and EGR pipe sub-assembly as shown in the illustration.

    2. A003CG8

      Install the EGR pipe sub-assembly with the 2 bolts and 2 nuts.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
    3. Tighten the intake air connector with the bolt and the 2 nuts.

      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
    4. Tighten the manifold stay.

      Torque:
      19 N*m  { 194 kgf*cm, 14 ft.*lbf }
  10. REMOVE EGR PIPE SUB-ASSEMBLY NO.1 (w/ EGR Valve)


    1. Remove the 3 bolts, the 2 nuts, and the EGR pipe sub-assembly.

    2. Remove the 2 gaskets.

  11. INSTALL DIESEL THROTTLE BODY ASSEMBLY

    Note

    After removing and installing, or replacing the throttle body, be sure to perform the operation check.


    1. Install a new gasket to intake air connector.

    2. A003F09

      Install the throttle body with the 2 bolts and the 2 nuts.

      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
    3. A003BFR

      Connect the 2 throttle body connectors.

  12. INSTALL AIR HOSE NO.4


    1. A003DQ1

      Install the air hose No.4 with the 2 clamps.

      Torque:
      6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
  13. INSTALL EGR PIPE SUB-ASSEMBLY (w/ EGR Valve)


    1. A003BF9

      Install 2 new gaskets to the cylinder head and the EGR pipe sub-assembly No.1 as shown in the illustration.

    2. A003CG8

      Install the EGR pipe with the 2 bolts and the 2 nuts.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
    3. A003BPA

      Connect the fuel pressure sensor connector.

  14. INSTALL OIL RETURN HOSE


    1. A003ICN

      Connect the oil return hose with the clip.

  15. INSTALL VANE PUMP OIL RESERVOIR ASSEMBLY


    1. A003HN0

      Install the vane pump oil reservoir assembly with the 2 bolts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
  16. INSTALL TIMING BELT


    1. A003D4RE01

      Check that the timing marks are aligned as shown in the illustration.

    2. Install the timing belt to pump drive shaft pulley, camshaft timing pulley and timing belt idler No.1 in sequence.

    3. A003C1U

      Set the tensioner to the press upright.

      Note


      • Do not allow the rod end to scratch and deform.

      • Press the tensioner rod in upward.

      • Protect a tip of the push rod with a rag in order to prevent damage.

    4. Using a press, slowly apply 981 to 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) of force to the push rod.

      Note

      Do not apply loads 981 to 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) or more on the push rod.

    5. Align the holes of push rod and housing, pass a 1.27 mm hexagon wrench through the holes to keep the setting position of the push rod.

    6. Temporarily install the timing belt tensioner with the 2 bolts while pushing the idler pulley toward the timing belt.

    7. Tighten the 2 bolts.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }

      Note

      Uniformly tighten the 2 bolts and install the tensioner

    8. Remove the 1.5 mm hexagon wrench from the tensioner.

    9. A003CL8E01

      Turn the crankshaft in the clockwise direction twice, check that the timing marks are aligned as shown in the illustration.

  17. INSTALL TIMING BELT COVER NO.1


    1. A003GME

      Install the timing belt No.1 cover with the 6 bolts.

      Torque:
      6.0 N*m  { 61 kgf*cm, 53 in.*lbf }
    2. Install the wire harness clamp.

  18. INSTALL FAN & GENERATOR V BELT


    1. Rotate the V-ribbed belt tensioner pulley clockwise, and then install the fan and generator V belt.

      Note

      Make sure that the fan and generator V belt is set properly on each pulley.

    2. Check that the indicator mark of the V-ribbed belt tensioner Click here.

  19. INSTALL ENGINE SERVICE HOLE SUB COVER SUB-ASSEMBLY


    1. Install the engine service hole sub cover with the 5 bolts.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
  20. INSTALL FRONT SEAT ASSEMBLY RH (for Hi-back Seat Type)


    1. A003DBM

      Connect the front seat inner belt assembly connector and install the front seat assembly.

    2. Align the front seat assembly adjuster pin with the holes in the body.

    3. Move the front seat assembly to the rearmost position.

      Note

      Make sure that the front seat assembly is securely locked.

    4. Temporarily tighten the 2 bolts on the front side of the front seat assembly.

    5. Move the front seat assembly fully forward.

      Note

      Make sure that the front seat assembly is securely locked.

    6. Temporarily tighten the 2 bolts on the rear side of the front seat assembly.

    7. Move the front seat assembly to the rearmost position.

      Note

      Make sure that the front seat assembly is securely locked.

    8. Fully tighten the 2 bolts on the front side of the front seat assembly in the order of outer and inner side.

      Torque:
      39 N*m  { 398 kgf*cm, 29 ft.*lbf }
    9. Move the front seat assembly fully forward.

      Note

      Make sure that the front seat assembly is securely locked.

    10. Fully tighten the 2 bolts on the rear side of the front seat assembly in the order of outer and inner side.

      Torque:
      39 N*m  { 398 kgf*cm, 29 ft.*lbf }
  21. INSTALL FRONT SEAT ASSEMBLY RH (for Low-back Seat Type)


    1. A003GD3

      Connect the front seat inner belt assembly connector and install the front seat assembly.

    2. Align the front seat assembly adjuster pin with the holes in the body.

    3. Move the front seat assembly to the rearmost position.

      Note

      Make sure that the front seat assembly is securely locked.

    4. Temporarily tighten the 2 bolts on the front side of the front seat assembly.

    5. Move the front seat assembly fully forward.

      Note

      Make sure that the front seat assembly is securely locked.

    6. Temporarily tighten the 2 bolts on the rear side of the front seat assembly.

    7. Move the front seat assembly to the rearmost position.

      Note

      Make sure that the front seat assembly is securely locked.

    8. Fully tighten the 2 bolts on the front side of the front seat assembly in the order of outer and inner side.

      Torque:
      39 N*m  { 398 kgf*cm, 29 ft.*lbf }
    9. Move the front seat assembly fully forward.

      Note

      Make sure that the front seat assembly is securely locked.

    10. Fully tighten the 2 bolts on the rear side of the front seat assembly in the order of outer and inner side.

      Torque:
      39 N*m  { 398 kgf*cm, 29 ft.*lbf }
  22. INSTALL FRONT DOOR SCUFF PLATE RH

  23. CONNECT BATTERY NEGATIVE CABLE

  24. BLEED FUEL LINE


    1. A003HBWE01

      Using the hand pump, bleed air from the fuel system until pumping becomes difficult.

  25. CHECK FOR FUEL LEAKAGE


    1. PERFORM ACTIVE TEST


      1. Connect the GTS to the DLC3.

      2. Turn the ignition switch on.

      3. Turn the GTS on.

      4. Enter the following menus: Powertrain / Engine and ECT / Active Test.

      5. Perform the Active Test.

        Tester Display Test Details Control Range Diagnostic Notes
        Test the Fuel Leak Pressurizes common rail internal fuel pressure, and checks for fuel leaks Stop/Start
        • Fuel pressure inside common rail pressurized to specified value and engine speed increased to 2,000 rpm when ON is selected

        • Above conditions preserved while test is ON