INTEGRATION RELAY INSPECTION


  1. INSPECT NO. 1 INTEGRATION RELAY (EFI MAIN)


    1. A003GMRE17
      Text in Illustration
      *a

      Component without harness connected

      (No. 1 Integration Relay)

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      10B-1 - 10B-4 Battery voltage not applied to terminals 10B-2 and 10B-3 10 kΩ or higher
      Battery voltage applied to terminals 10B-2 and 10B-3 Below 1 Ω

      If the result is not as specified, replace the No. 1 integration relay.