PURGE VALVE INSTALLATION


  1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY NO.1 (EVAP VSV)


    1. Install the vacuum switching valve assembly No.1 with the bolt.

      Torque:
      9.0 N*m  { 92 kgf*cm, 80 in.*lbf }
    2. Connect the fuel vapor feed hose No.2 and the duty vacuum switching valve connector.

    3. Connect the fuel vapor feed hose.