INSTALL AIR SWITCHING VALVE ASSEMBLY
Install the air switching valve assembly with 2 new nuts.
Connect the air switching valve connector.
INSTALL NO. 4 INTAKE PIPE
Install 2 new gaskets and the No. 4 intake pipe with 4 new nuts in the order shown in the illustration. Tighten the nuts labeled 1 and 3 to the torque specification again.
Check that the nuts are tightened to the torque specification.
Note
Tightening the nuts only once is not enough to tighten them to the torque specification.
INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
Install the No. 1 exhaust manifold heat insulator with the 4 bolts.
INSTALL AIR PUMP INLET PIPE
Install the air pump inlet pipe with the 2 bolts.
Connect the No. 5 air hose, and slide the clamp to secure the hose.
Connect the No. 6 air hose, and slide the clamp to secure the hose.
INSTALL BATTERY SERVICE HOLE COVER
INSTALL ENGINE SERVICE HOLE SUB COVER SUB-ASSEMBLY
Install the engine service hole cover sub-assembly with the 5 bolts.
INSTALL FRONT DOOR SCUFF PLATE RH
INSTALL FRONT SEAT ASSEMBLY RH
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.
PERFORM INITIALIZATION