GENERATOR(for 100 A Type) INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. Install the generator with the 3 bolts.

      Torque:
      25 N*m  { 255 kgf*cm, 18 ft.*lbf }

      Note

      Make sure that the wire harness of the crankshaft position sensor does not get caught between the cylinder block and generator when installing the generator.

    2. Install the wire harness clamp bracket with the bolt.

      Torque:
      8.4 N*m  { 85 kgf*cm, 74 in.*lbf }
    3. Connect the generator wire to terminal B with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    4. Connect the generator connector and attach the clamp.

    5. Install the terminal cap.

  2. INSTALL FAN AND GENERATOR V BELT

    Click here

  3. INSTALL FRONT SUSPENSION MEMBER REINFORCEMENT RH

    Click here

  4. INSTALL REAR ENGINE UNDER COVER RH

    Click here

  5. INSTALL ENGINE UNDER COVER

    Click here

  6. INSTALL FRONT LOWER BUMPER ABSORBER

    Click here

  7. INSTALL RADIATOR SUPPORT OPENING COVER

    Click here

  8. INSTALL NO. 1 ENGINE COVER


    1. Attach the 4 clips to install the No. 1 engine cover.

  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  10. INSTALL FRONT DRIVE SHAFT ASSEMBLY RH

    Click here