DESCRIPTION
The air conditioning amplifier assembly receives the headlight illumination signal and uses the signal to judge electric load conditions. The electric load signal is one element of PTC heater control.
WIRING DIAGRAM
PROCEDURE
CHECK HEADLIGHT (OPERATION)
Check if the headlight comes on when the light control switch is turned to the headlight position.
| OK |
|---|
| Headlight comes on. |
| NG |
|
GO TO LIGHTING SYSTEM Click here |
| OK |
|
CHECK HARNESS AND CONNECTOR (HEADLIGHT SIGNAL)
| *1 | Rear view of wire harness connector (to Air Conditioning Amplifier Assembly) |
Disconnect the D47 amplifier connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| OK |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here |
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |