POWER DOOR LOCK CONTROL SYSTEM Power Source Circuit

DESCRIPTION

The main power source for the main body ECU (instrument panel junction block assembly) is supplied via the door control battery.

WIRING DIAGRAM

A00535WE06

CAUTION / NOTICE / HINT

Note


  • As the door control battery is installed between the vehicle battery and main body ECU (instrument panel junction block assembly), first perform the inspections in On-Vehicle Inspection to confirm that there are no malfunctions in the power source circuit for the main body ECU (instrument panel junction block assembly) before performing this troubleshooting procedure Click here.

  • Inspect the fuses for circuits related to this system before performing the following procedure.

PROCEDURE


  1. CHECK HARNESS AND CONNECTOR (DOOR CONTROL BATTERY - BATTERY AND BODY GROUND)


    1. A00589UE02
      Text in Illustration
      *a

      Front view of wire harness connector

      (to Door Control Battery)

      Disconnect the door control battery connector.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      D138-2 (GND1) - Body ground Always Below 1 Ω
    3. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Condition Specified Condition
      D138-4 (BECU) - Body ground Always 11 to 14 V

    NG
    OK
  2. CHECK HARNESS AND CONNECTOR (DOOR CONTROL BATTERY - MAIN BODY ECU [INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY])


    1. Disconnect the D138 door control battery connector.

    2. Disconnect the DB main body ECU (instrument panel junction block assembly) connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      D138-3 (EDOR) - DB-12 Always Below 1 Ω
      D138-3 (EDOR) or DB-12 - Body ground Always 10. kΩ or higher

    NG
    OK
  3. CHECK DOOR CONTROL BATTERY (POWER OUTPUT)


    1. Turn the ignition switch off.

    2. Remove the BODY ECU fuse from the No. 1 engine room relay block (*A).

    3. Leave the vehicle as is for 30 minutes (wait until the door control battery is discharged) (*B).

      Tech Tips

      Discharge time is reduced when the door control battery is not fully charged.

    4. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Switch Condition Specified Condition
      D138-3 (EDOR) - Body ground Ignition switch off (*A → *B) 11 to 14 V (*A) → Below 2 V (*B)
    5. Install the BODY ECU fuse to the No. 1 engine room relay block.

    6. Leave the vehicle as is for 90 seconds (wait until the door control battery is charged).

    7. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Switch Condition Specified Condition
      D138-3 (EDOR) - Body ground Ignition switch off 11 to 14 V

    OK
    NG