GENERATOR INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. Install the wire harness clamp bracket with the bolt.

      Torque:
      8.4 N*m  { 85 kgf*cm, 74 in.*lbf }
    2. Temporarily install the generator with the bolt.

    3. A00546X

      Temporarily install the adjusting bar with the 2 bolts.

      Text in Illustration
      A0054DN Bolt A
      A0057VO Bolt B

      Tech Tips

      Item Bolt Length
      Bolt A 35 mm (1.38 in.)
      Bolt B 30 mm (1.18 in.)
    4. Tighten bolt A.

      Torque:
      19 N*m  { 189 kgf*cm, 14 ft.*lbf }
    5. A0053RC

      Install the wire harness to terminal B with the nut and install the terminal cap.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    6. Connect the connector and attach the wire harness clamp.

  2. INSTALL V-RIBBED BELT

    Click here

  3. ADJUST V-RIBBED BELT

    Click here

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  5. INSPECT V-RIBBED BELT

    Click here

  6. INSTALL REAR ENGINE UNDER COVER RH

    Click here

  7. INSTALL NO. 2 CYLINDER HEAD COVER

    Click here

  8. INSTALL RADIATOR SUPPORT OPENING COVER

    Click here