STARTER INSTALLATION

PROCEDURE


  1. INSTALL FLYWHEEL HOUSING SIDE COVER


    1. Install the flywheel housing side cover to the cylinder block.

  2. INSTALL STARTER ASSEMBLY


    1. Install the starter with the 2 bolts.

      Torque:
      37 N*m  { 380 kgf*cm, 27 ft.*lbf }
    2. Connect the connector.

    3. Connect the starter wire with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    4. Connect the terminal cap.

  3. INSTALL BATTERY CARRIER

    Click here

  4. INSTALL BATTERY TRAY

  5. INSTALL BATTERY

  6. INSTALL BATTERY CLAMP SUB-ASSEMBLY

    Click here

  7. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

    Click here

  8. INSTALL NO. 1 ENGINE UNDER COVER

    Click here

  9. INSTALL FRONT LOWER BUMPER ABSORBER

    Click here

  10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  11. INSTALL RADIATOR SUPPORT OPENING COVER

    Click here

  12. INSTALL NO. 2 CYLINDER HEAD COVER

    Click here