PROCEDURE
INSTALL OIL PUMP ASSEMBLY
Install the oil pump with the 3 bolts.
INSTALL NO. 2 OIL PAN SUB-ASSEMBLY
| *1 | Seal Packing |
| *2 | 6.0 mm |
| *3 | 3.5 to 4.5 mm |
Remove any old packing material and be careful not to drop any oil on the contact surfaces of the cylinder block and oil pan.
Apply seal packing in a continuous line as shown in the illustration.
| Application Specification | ||||||||
|---|---|---|---|---|---|---|---|---|
|
| Seal packing |
|---|
| Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent |
Note
Remove any oil from the contact surfaces.
Install the oil pan within 3 minutes and tighten the bolts within 10 minutes after applying seal packing.
Do not add engine oil for at least 2 hours after installing the oil pan.
Install the No. 2 oil pan with the 10 bolts and 2 nuts.
INSTALL NO. 2 CHAIN SUB-ASSEMBLY
Temporarily install the crankshaft pulley bolt.
Set the crankshaft key as shown in the illustration.
Turn the drive shaft so that the cutout faces upward.
Remove the crankshaft pulley bolt.
Align the yellow mark plates with the timing mark of each gear as shown in the illustration.
Install the gears onto the crankshaft and oil pump shaft with the chain on the gears.
Temporarily install the oil pump drive shaft gear with the nut.
Install the damper spring to the chain tensioner plate, and then install the chain tensioner plate with the bolt.
Temporarily install the crankshaft pulley with the pulley bolt.
Using SST, hold the crankshaft. Then tighten the drive shaft gear nut.
for 86 mm (3.39 in.) Bolt Pitch Type:
for 64 mm (2.52 in.) Bolt Pitch Type:
Tech Tips
For the 64 mm (2.52 in.) bolt pitch type, the part number of the installation bolt for SST (crankshaft pulley holding tool) is 91551-00850 (quantity: 2).
Remove SST, the crankshaft pulley bolt and crankshaft pulley.
INSTALL CRANKSHAFT TIMING SPROCKET
| *1 | Front |
Install the crankshaft timing sprocket as shown in the illustration.
INSTALL NO. 1 CHAIN VIBRATION DAMPER
SET NO. 1 CYLINDER TO TDC/COMPRESSION
INSTALL CHAIN SUB-ASSEMBLY
INSTALL CHAIN TENSIONER SLIPPER
CHECK NO. 1 CYLINDER TO TDC/COMPRESSION
INSTALL TIMING CHAIN COVER SUB-ASSEMBLY
Install a new gasket.
Note
Remove any oil from the contact surface.
Install the water pump with the 3 bolts.
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the timing chain cover, cylinder head, camshaft housing, stiffening crankcase and cylinder block.
| *1 | Engine Side: |
| *2 | Timing Chain Cover Side: |
| *3 | Clean and degrease |
Install 3 new O-rings.
Apply seal packing as shown in the illustration.
| *1 | 5.0 mm |
| Seal packing |
|---|
| Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent |
| Standard seal diameter |
|---|
| 5.0 mm (0.197 in.) |
Note
Remove any oil from the contact surface.
Install the timing chain cover within 3 minutes and tighten the bolts within 10 minutes after applying seal packing.
Do not add engine oil for at least 2 hours after installing the timing chain cover.
Apply seal packing to the timing chain cover in a continuous line as shown in the following illustration.
| Seal Packing | |||||||
|---|---|---|---|---|---|---|---|
|
| Application Specification | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Note
When the contact surfaces are wet, wipe them with oil-free cloth before applying seal packing.
Install the timing chain cover within 3 minutes and tighten the bolts within 10 minutes after applying seal packing.
After applying seal packing to the timing chain cover, install the engine mounting bracket and oil filter bracket within 10 minutes.
Do not add engine oil for at least 2 hours after installation.
Clean the bolts and their installation holes.
Install the timing chain cover.
Temporarily install the engine mounting bracket with the 3 bolts.
Note
Install the mounting bracket within 10 minutes after installing the timing chain cover.
Do not add engine oil for at least 2 hours after installation.
Install 2 new O-rings.
Temporarily install the oil filter bracket with the 4 bolts.
Note
Install the oil filter bracket within 10 minutes after installing the timing chain cover.
Do not add engine oil for at least 2 hours after installation.
| *1 | Adhesive |
Apply adhesive to 5 and a half threads or more of the end of bolt E.
| Adhesive |
|---|
| Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent |
Install the timing chain cover with the 26 bolts and seal washer in the order shown in the illustration.
Note
When the contact surfaces are wet, wipe them with oil-free cloth before applying seal packing.
Install the timing chain cover within 3 minutes and tighten the bolts within 10 minutes after applying the seal packing.
Do not add engine oil for at least 2 hours after installation.
| Bolt Length | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Tech Tips
Apply adhesive to bolt E before installing it.
INSTALL TIMING CHAIN COVER OIL SEAL
INSTALL CRANKSHAFT PULLEY
INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY
INSTALL SPARK PLUG TUBE GASKET
INSTALL CYLINDER HEAD COVER GASKET
INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
INSTALL RADIO SETTING CONDENSER
INSTALL IGNITION COIL ASSEMBLY
INSTALL THERMOSTAT
INSTALL WATER INLET
CONNECT WATER INLET HOSE
Connect the water inlet hose to the water inlet housing.
CONNECT NO. 3 WATER BY-PASS HOSE
Connect the No. 3 water by-pass hose to the water inlet housing.
INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
INSTALL ENGINE ASSEMBLY WITH TRANSAXLE
Install the engine assembly with transaxle Click here.