PURGE VALVE INSPECTION

PROCEDURE


  1. INSPECT PURGE VSV


    1. A0054TJE05

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 23 to 26 Ω
      1 - VSV body Always 10 MΩ or higher
      2 - VSV body Always 10 MΩ or higher
    2. Check the operation of the purge VSV.


      1. A0057J8E01
        *1 Does not flow

        Check that air does not flow from port E to port F.

      2. A0056IGE01
        *1 Air

        Apply battery voltage to terminals 1 and 2.

      3. Check that air flows from port E to port F.

        If the result is not as specified, replace the purge VSV.