PROCEDURE
INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
Install the park/neutral position switch to the manual valve shaft.
Temporarily install the 2 bolts.
Install a new lock plate and the lock nut.
Temporarily install the control shaft lever.
Turn the lever counterclockwise until it stops, and then turn it clockwise 2 notches.
Remove the control shaft lever.
| *1 | Neutral Basic Line |
| *2 | Protrusion |
Align the groove with the neutral basic line.
Hold the switch in this position and tighten the 2 bolts.
Using a screwdriver, bend the tabs of the lock plate.
Install the control shaft lever with the washer and nut.
CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
Connect the transmission control cable to the control shaft lever with the nut.
Connect the park/neutral position switch connector.
INSTALL BATTERY CARRIER
INSTALL BATTERY
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.
INSTALL RADIATOR SUPPORT OPENING COVER
INSPECT SHIFT LEVER POSITION
ADJUST SHIFT LEVER POSITION
INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY