POWER MANAGEMENT CONTROL ECU INSTALLATION


  1. INSTALL POWER MANAGEMENT CONTROL ECU


    1. A01HSV2E01

      Install the power management control ECU with the 2 nuts in the order shown in the illustration.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
    2. Connect the 4 connectors.

  2. INSTALL LOWER NO. 1 INSTRUMENT PANEL AIRBAG ASSEMBLY

    Click here