DESCRIPTION
The skid control ECU (brake booster with master cylinder assembly) is connected to the combination meter assembly via CAN communication.
If any of the following is detected, the brake warning light / red (malfunction) remains on:
The skid control ECU (brake booster with master cylinder assembly) connector is disconnected from the brake booster with master cylinder assembly.
The brake fluid level is insufficient.
The parking brake is applied.
EBD operation has been disabled.
WIRING DIAGRAM
INSPECTION PROCEDURE
Note
When replacing the skid control ECU (brake booster with master cylinder assembly), perform initialization and calibration of the linear solenoid valve Click here.
PROCEDURE
CHECK DTC
Check if ABS, VSC and/or electronically controlled brake system DTCs are output Click here.
| Result | ||||||
|---|---|---|---|---|---|---|
|
| B |
|
REPAIR CIRCUITS INDICATED BY OUTPUT DTCS Click here |
| A |
|
CHECK CAN COMMUNICATION SYSTEM
Check if a CAN communication system DTC is output Click here.
| Result | ||||||
|---|---|---|---|---|---|---|
|
| B |
|
INSPECT CAN COMMUNICATION SYSTEM Click here |
| A |
|
CHECK IF SKID CONTROL ECU CONNECTOR IS SECURELY CONNECTED
Check if the skid control ECU (brake booster with master cylinder assembly) connector is securely connected.
| OK |
|---|
| The connector is securely connected. |
| NG |
|
CONNECT CONNECTOR TO ECU CORRECTLY |
| OK |
|
CHECK AUXILIARY BATTERY
Check the auxiliary battery voltage.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
CHARGE OR REPLACE AUXILIARY BATTERY |
| OK |
|
CHECK HARNESS AND CONNECTOR (IG1 TERMINAL)
| *a | Front view of wire harness connector (to Skid Control ECU (Brake Booster with Master Cylinder Assembly)) |
Disconnect the skid control ECU (brake booster with master cylinder assembly) connector.
Turn the power switch on (IG).
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (IG1 CIRCUIT) |
| OK |
|
CHECK HARNESS AND CONNECTOR (GND TERMINAL)
| *a | Front view of wire harness connector (to Skid Control ECU (Brake Booster with Master Cylinder Assembly)) |
Turn the power switch off.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (GND CIRCUIT) |
| OK |
|
READ VALUE USING TECHSTREAM (PARKING BRAKE SWITCH ASSEMBLY)
Reconnect the skid control ECU (brake booster with master cylinder assembly) connector.
Connect the Techstream to the DLC3.
Turn the power switch on (IG).
Select the Data List on the Techstream Click here.
| Tester Display | Measurement Item/Range | Normal Condition | Diagnostic Note |
|---|---|---|---|
| Parking Brake SW | Parking brake switch assembly / ON or OFF | ON: Parking brake applied OFF: Parking brake released |
- |
Using the Techstream, check if the switch condition on the Techstream changes according to parking brake operation.
| OK |
|---|
| The Techstream displays ON or OFF according to parking brake operation. |
| NG |
|
INSPECT PARKING BRAKE SWITCH ASSEMBLY Click here |
| OK |
|
INSPECT COMBINATION METER ASSEMBLY
Turn the power switch off.
Perform the Active Test of the combination meter assembly (meter CPU) using the Techstream Click here.
Check the combination meter assembly.
| OK |
|---|
| The brake warning light / red (malfunction) turns on or off in accordance with Techstream operation. |
Tech Tips
If troubleshooting has been carried out according to Problem Symptoms Table, refer back to the table and proceed to the next step before replacing the part Click here.
| NG |
|
REPLACE COMBINATION METER ASSEMBLY Click here |
| OK |
|
REPLACE BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY Click here
INSPECT PARKING BRAKE SWITCH ASSEMBLY
| *a | Component without harness connected (Parking Brake Switch Assembly) |
Turn the power switch off.
Disconnect the parking brake switch assembly connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPLACE PARKING BRAKE SWITCH ASSEMBLY Click here |
| OK |
|
CHECK HARNESS AND CONNECTOR (MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU) - PARKING BRAKE SWITCH ASSEMBLY)
Disconnect the main body ECU (multiplex network body ECU) connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
Tech Tips
If troubleshooting has been carried out according to Problem Symptoms Table, refer back to the table and proceed to the next step before replacing the part Click here.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU) Click here