HYBRID CONTROL SYSTEM ECU Power Source Circuit

DESCRIPTION

If the power switch is on (IG), the power management control ECU applies current to the MREL terminal to turn the IGCT relay on. This supplies power to the +B1 and +B2 terminals.

WIRING DIAGRAM

A01HTJRE01

Refer to the wiring diagram for DTC P0A08-264 Click here.

INSPECTION PROCEDURE

PROCEDURE


  1. CHECK POWER MANAGEMENT CONTROL ECU (+B1, +B2 VOLTAGE)


    1. Turn the power switch on (IG).

    2. A01HVV8E03
      Text in Illustration
      *a

      Component with harness connected

      (Power Management Control ECU)

      Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Switch Condition Specified Condition
      A39-5 (+B1) - Body ground Power switch on (IG) 11 to 14 V
      A38-2 (+B2) - Body ground Power switch on (IG) 11 to 14 V
    3. Turn the power switch off.


    NG
    OK
  2. CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - BODY GROUND)


    1. Disconnect connector I3 and I4 from the power management control ECU.

    2. A01HU4AE04
      Text in Illustration
      *a

      Rear view of wire harness connector

      (to Power Management Control ECU)

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      I3-5 (E01) - Body ground Always Below 1 Ω
      I3-6 (E1) - Body ground Always Below 1 Ω
      I4-4 (E12) - Body ground Always Below 1 Ω
      I4-5 (E02) - Body ground Always Below 1 Ω
    3. Connect the power management control ECU connectors.


    NG
    OK
  3. CHECK POWER MANAGEMENT CONTROL ECU (MREL VOLTAGE)


    1. Turn the power switch on (IG).

    2. A01HVV8E05
      Text in Illustration
      *a

      Component with harness connected

      (Power Management Control ECU)

      Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Switch Condition Specified Condition
      A39-6 (MREL) - Body ground Power switch on (IG) 11 to 14 V

    NG
    OK
  4. CHECK FUSE (PM IGCT)


    1. A01HUSIE01
      Text in Illustration
      *1 No. 2 Engine Room Relay Block
      *2 PM IGCT Fuse

      Remove the PM IGCT fuse from the No. 2 engine room relay block.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      PM IGCT fuse terminals Always Below 1 Ω
    3. Install the PM IGCT fuse.


    NG
    OK
  5. CHECK FUSE (IGCT-MAIN)


    1. A01HSBVE01
      Text in Illustration
      *1 No. 2 Engine Room Relay Block
      *2 IGCT-MAIN Fuse

      Remove the IGCT-MAIN fuse from the No. 2 engine room relay block.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      IGCT-MAIN fuse terminals Always Below 1 Ω
    3. Install the IGCT-MAIN fuse.


    NG
    OK
  6. INSPECT RELAY (IGCT)


    1. Remove the IGCT relay from the No. 2 engine room relay block.

    2. A01HTZ0E01
      Text in Illustration
      *1 IGCT Relay

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      3 - 5 Auxiliary battery voltage is not applied between terminals 1 and 2 10 kΩ or higher
      Auxiliary battery voltage is applied between terminals 1 and 2 Below 1 Ω
    3. Install the IGCT relay.


    NG
    OK
  7. CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 2 ENGINE ROOM RELAY BLOCK)


    1. A01HUSIE01
      Text in Illustration
      *1 No. 2 Engine Room Relay Block
      *2 PM IGCT Fuse

      Remove the PM IGCT fuse from the No. 2 engine room relay block.

    2. Disconnect connector A38 and A39 from the power management control ECU.

    3. Measure the resistance according to the value(s) in the table below.

      A01HSRFE01
      Text in Illustration
      *1 No. 2 Engine Room Relay Block *2 PM IGCT Fuse
      *a

      Rear view of wire harness connector

      (to Power Management Control ECU)

      - -
      Standard Resistance
      Tester Connection Condition Specified Condition
      A39-5 (+B1) - 2 (PM IGCT fuse) Always Below 1 Ω
      A38-2 (+B2) - 2 (PM IGCT fuse) Always Below 1 Ω
    4. Install the PM IGCT fuse.

    5. Connect the power management control ECU connectors.


    NG
    OK
  8. CHECK HARNESS AND CONNECTOR (NO. 2 ENGINE ROOM RELAY BLOCK)


    1. A01HSTZE01
      Text in Illustration
      *1 No. 2 Engine Room Relay Block
      *2 PM IGCT Fuse
      *3 IGCT-MAIN Fuse

      Remove the IGCT-MAIN fuse and PM IGCT fuse from the No. 2 engine room relay block.

    2. Remove the IGCT relay from the No. 2 engine room relay block.

    3. A01HT28E01
      Text in Illustration
      *1 No. 2 Engine Room Relay Block
      *2 PM IGCT Fuse
      *3 IGCT Relay
      *4 IGCT-MAIN Fuse

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      3 (IGCT relay) - 2 (IGCT-MAIN fuse) Always Below 1 Ω
      5 (IGCT relay) - 2 (PM IGCT fuse) Always Below 1 Ω
    4. Install the IGCT-MAIN fuse and PM IGCT fuse.

    5. Install the IGCT relay.


    NG
    OK
  9. CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 2 ENGINE ROOM RELAY BLOCK)


    1. Remove the IGCT relay from the No. 2 engine room relay block.

    2. Disconnect connector A39 from the power management control ECU.

    3. Measure the resistance according to the value(s) in the table below.

      A01HV8LE01
      Text in Illustration
      *1 No. 2 Engine Room Relay Block *2 IGCT Relay
      *a

      Rear view of wire harness connector

      (to Power Management Control ECU)

      - -
      Standard Resistance
      Tester Connection Condition Specified Condition
      A39-6 (MREL) - 1 (IGCT relay) Always Below 1 Ω
      A39-6 (MREL) or 1 (IGCT relay) - Body ground and other terminals Always 10 kΩ or higher
    4. Install the IGCT relay.

    5. Connect the power management control ECU connectors.


    NG
    OK
  10. CHECK HARNESS AND CONNECTOR (NO. 2 ENGINE ROOM RELAY BLOCK - BODY GROUND)


    1. Remove the IGCT relay from the No. 2 engine room relay block.

    2. A01HVJ2E01
      Text in Illustration
      *1 No. 2 Engine Room Relay Block
      *2 IGCT Relay

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      2 (IGCT relay) - Body ground Always Below 1 Ω
    3. Install the IGCT relay.


    NG
    OK
  11. CHECK HARNESS AND CONNECTOR (ENGINE ROOM RELAY BLOCK AND JUNCTION BLOCK ASSEMBLY - NO. 2 ENGINE ROOM RELAY BLOCK)


    1. Remove the IGCT-MAIN fuse from the No. 2 engine room relay block.

    2. Disconnect AMD terminal from the engine room relay block and junction block assembly.

    3. Measure the resistance according to the value(s) in the table below.

      A01HT6WE01
      Text in Illustration
      *1 Engine Room Relay Block and Junction Block Assembly *2 No. 2 Engine Room Relay Block
      *3 IGCT-MAIN Fuse - -
      Standard Resistance
      Tester Connection Condition Specified Condition
      1K-1 (AMD) - 1 (IGCT-MAIN fuse) Always Below 1 Ω
    4. Install the IGCT-MAIN fuse.

    5. Connect AMD terminal.


    NG
    OK
  12. CHECK FUSIBLE LINK BLOCK ASSEMBLY (R/B NO. 2)


    1. Check the fusible link block assembly (R/B NO. 2) in the engine room relay block and junction block assembly for improper installation.

      OK
      The fusible link is installed securely.
    2. Remove the fusible link block assembly from the engine room relay block and junction block assembly.

    3. A01HVURE03
      Text in Illustration
      *1 Fusible Link Block Assembly

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Fusible link block assembly 1 -2 terminals (R/B NO. 2) Always Below 1 Ω
    4. Install the fusible link block assembly.


    NG
    OK
  13. CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 2 ENGINE ROOM RELAY BLOCK)


    1. Disconnect connector E11 from the shift lever position sensor.

    2. A01HUSIE01
      Text in Illustration
      *1 No. 2 Engine Room Relay Block
      *2 PM IGCT Fuse

      Remove the PM IGCT fuse from the No. 2 engine room relay block.

    3. Disconnect connectors A38 and A39 from the power management control ECU.

    4. Measure the resistance according to the value(s) in the table below.

      A01HSRFE01
      Text in Illustration
      *1 No. 2 Engine Room Relay Block *2 PM IGCT Fuse
      *a

      Rear view of wire harness connector

      (to Power Management Control ECU)

      - -
      Standard Resistance
      Tester Connection Condition Specified Condition
      A39-5 (+B1) or 2 (PM IGCT fuse) - Body ground and other terminals Always 10 kΩ or higher
      A38-2 (+B2) or 2 (PM IGCT fuse) - Body ground and other terminals Always 10 kΩ or higher
    5. Install the PM IGCT fuse.

    6. Connect the shift lever position sensor connector.

    7. Connect the power management control ECU connectors.


    NG
    OK
  14. REPAIR OR REPLACE HARNESS OR CONNECTOR


    NEXT
  15. CHECK HARNESS AND CONNECTOR (NO. 2 ENGINE ROOM RELAY BLOCK)


    1. A01HSTZE01
      Text in Illustration
      *1 No. 2 Engine Room Relay Block
      *2 PM IGCT Fuse
      *3 IGCT-MAIN Fuse

      Remove the IGCT-MAIN fuse and PM IGCT fuse from the No. 2 engine room relay block.

    2. Remove the IGCT relay from the No. 2 engine room relay block.

    3. A01HT28E01
      Text in Illustration
      *1 No. 2 Engine Room Relay Block
      *2 PM IGCT Fuse
      *3 IGCT Relay
      *4 IGCT-MAIN Fuse

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      3 (IGCT relay) or 2 (IGCT-MAIN fuse) - Body ground and other terminals Always 10 kΩ or higher
      5 (IGCT relay) or 2 (PM IGCT fuse) - Body ground and other terminals Always 10 kΩ or higher
    4. Install the IGCT-MAIN fuse and PM IGCT fuse.

    5. Install the IGCT relay.


    NG
    OK
  16. REPAIR OR REPLACE HARNESS OR CONNECTOR


    NEXT