DESCRIPTION
The headlight beam level control system indicator light in the combination meter assembly comes on for approximately 3 seconds when the ignition switch is turned to ON. The indicator light also comes on when the headlight leveling ECU assembly detects a malfunction.
WIRING DIAGRAM
INSPECTION PROCEDURE
PROCEDURE
CHECK HARNESS AND CONNECTOR (BATTERY - COMBINATION METER ASSEMBLY)
| *1 | Front view of wire harness connector (to Combination Meter Assembly) |
Disconnect the E2 combination meter assembly connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||||
|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (COMBINATION METER ASSEMBLY - HEADLIGHT LEVELING ECU ASSEMBLY)
| *1 | Front view of wire harness connector (to Headlight Leveling ECU Assembly) |
| *2 | Front view of wire harness connector (to Combination Meter Assembly) |
Disconnect the A40 headlight leveling ECU assembly connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
INSPECT COMBINATION METER ASSEMBLY
| *1 | Component with harness connected (Combination Meter Assembly) |
Reconnect the E2 combination meter assembly connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPLACE COMBINATION METER ASSEMBLY Click here |
| OK |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here