DESCRIPTION
The power management control ECU will store this DTC when no signals can be received from the ECUs that have been memorized as those that are connected to the CAN No. 2 bus.
When the power management control ECU receives a response signal from the ECUs connected to the CAN No. 2 bus, the power management control ECU recognizes and memorizes that the ECU is connected to the CAN No. 2 bus. Based on this memorized data, the power management control ECU monitors for malfunctions in the ECUs connected to the CAN No. 2 bus when communicating with those ECUs. If the power management control ECU cannot receive response signals from the ECUs that have been memorized as those connected to the CAN No. 2 bus, the power management control ECU determines that a malfunction exists.
| DTC No. | DTC Detection Condition | Trouble Area |
|---|---|---|
| U1002 | Power management control ECU cannot receive signals from all ECUs that have been memorized as those connected to the CAN No. 2 bus. |
|
WIRING DIAGRAM
INSPECTION PROCEDURE
Note
Turn the ignition switch off before measuring the resistances between CAN bus main wires and between CAN bus branch wires.
Turn the ignition switch off before inspecting CAN bus wires for a ground short.
After the ignition switch is turned off, check that the key reminder warning system and light reminder warning system are not operating.
Before measuring the resistance, leave the vehicle as is for at least 1 minute and do not operate the ignition switch, any other switches or the doors. If any doors need to be opened in order to check connectors, open the doors and leave them open.
Tech Tips
Operating the ignition switch, any other switches or a door triggers related ECU and sensor communication on the CAN. This communication will cause the resistance value to change.
Even after DTCs are cleared, if a DTC is stored again after driving the vehicle for a while, the malfunction may be occurring due to vibration of the vehicle. In such a case, wiggling the ECUs or wire harness while performing the inspection below may help determine the cause of the malfunction.
PROCEDURE
CHECK CAN NO. 2 BUS WIRE
Turn the ignition switch off.
| *1 | Component with harness connected (CAN No. 3 Junction Connector) |
| *2 | Earth Terminal |
| *3 | DLC3 |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Disconnect the cable from the negative (-) battery terminal.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Result | ||||||||
|---|---|---|---|---|---|---|---|---|
|
| B |
|
CHECK FOR OPEN IN CAN NO. 2 BUS MAIN WIRE (CAN NO. 3 J/C) Click here |
| C |
|
CHECK FOR SHORT IN CAN NO. 2 BUS WIRE (CAN NO. 3 J/C) Click here |
| A |
|
REPLACE POWER MANAGEMENT CONTROL ECU Click here
CHECK FOR OPEN IN CAN NO. 2 BUS MAIN WIRE (CAN NO. 3 J/C)
| *1 | Rear view of wire harness connector (to CAN No. 3 Junction Connector) |
| *2 | Earth Terminal |
| *3 | Red |
| *4 | White |
Disconnect the CAN No. 3 junction connector (D69).
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
CHECK FOR OPEN IN CAN NO. 2 BUS MAIN WIRE (POWER MANAGEMENT CONTROL ECU) Click here |
| OK |
|
REPLACE CAN NO. 3 J/C
CHECK FOR OPEN IN CAN NO. 2 BUS MAIN WIRE (POWER MANAGEMENT CONTROL ECU)
Reconnect the CAN No. 3 junction connector (D69).
| *1 | Rear view of wire harness connector (to Power Management Control ECU) |
Disconnect the power management control ECU connector (D43).
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE CAN NO. 2 BUS MAIN WIRE OR CONNECTOR (POWER MANAGEMENT CONTROL ECU - CAN NO. 3 J/C) |
| OK |
|
REPLACE POWER MANAGEMENT CONTROL ECU Click here
CHECK FOR SHORT IN CAN NO. 2 BUS WIRE (CAN NO. 3 J/C)
| *1 | Rear view of wire harness connector (to CAN No. 3 Junction Connector) |
| *2 | Earth Terminal |
| *3 | DLC3 |
| *4 | Red |
| *5 | White |
Disconnect the CAN No. 3 junction connector (D69).
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Tech Tips
It is only necessary to perform the inspection in the above table for the result (open or short circuit) that was obtained in the Check CAN No. 2 Bus Wire inspection.
Find the necessary inspection from the Purpose column that matches the result in the Result column from the Check CAN No. 2 Bus Wire inspection.
| NG |
|
CHECK FOR SHORT IN CAN NO. 2 BUS WIRE (POWER MANAGEMENT CONTROL ECU) Click here |
| OK |
|
CHECK FOR SHORT IN CAN NO. 2 BUS WIRE (AFS ECU)
Reconnect the CAN No. 3 junction connector (D69).
Disconnect the AFS ECU connector.
| *1 | Front view of wire harness connector (to AFS ECU) |
| *2 | DLC3 |
Measure the resistance of the wire harness side connectors.
| Standard Resistance | ||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Tech Tips
It is only necessary to perform the inspection in the above table for the result (open or short circuit) that was obtained in the Check CAN No. 2 Bus Wire inspection.
Find the necessary inspection from the Purpose column that matches the result in the Result column from the Check CAN No. 2 Bus Wire inspection.
| NG |
|
CHECK CAN NO. 2 BUS BRANCH WIRE (AFS ECU) Click here |
| OK |
|
REPLACE AFS ECU Click here
CHECK CAN NO. 2 BUS BRANCH WIRE (AFS ECU)
| *1 | Rear view of wire harness connector (to CAN No. 3 Junction Connector) |
| *2 | Earth Terminal |
| *3 | Yellow |
| *4 | White |
Disconnect the CAN No. 3 junction connector (D70).
Measure the resistance of the wire harness side connectors.
| *1 | Front view of wire harness connector (to AFS ECU) |
| *2 | DLC3 |
| Standard Resistance | ||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Tech Tips
It is only necessary to perform the inspection in the above table for the result (open or short circuit) that was obtained in the Check CAN No. 2 Bus Wire inspection.
Find the necessary inspection from the Purpose column that matches the result in the Result column from the Check CAN No. 2 Bus Wire inspection.
| NG |
|
REPAIR OR REPLACE CAN NO. 2 BUS BRANCH WIRE OR CONNECTOR (AFS ECU - CAN NO. 3 J/C) |
| OK |
|
REPLACE CAN NO. 3 J/C
CHECK FOR SHORT IN CAN NO. 2 BUS WIRE (POWER MANAGEMENT CONTROL ECU)
Reconnect the CAN No. 3 junction connector (D69).
| *1 | Rear view of wire harness connector (to Power Management Control ECU) |
Disconnect the power management control ECU connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Tech Tips
It is only necessary to perform the inspection in the above table for the result (open or short circuit) that was obtained in the Check CAN No. 2 Bus Wire inspection.
Find the necessary inspection from the Purpose column that matches the result in the Result column from the Check CAN No. 2 Bus Wire inspection.
| NG |
|
REPAIR OR REPLACE CAN NO. 2 BUS MAIN WIRE OR CONNECTOR (POWER MANAGEMENT CONTROL ECU - CAN NO. 3 J/C) |
| OK |
|
REPLACE POWER MANAGEMENT CONTROL ECU Click here