INTEGRATION RELAY INSTALLATION


  1. INSTALL POWER DISTRIBUTION


    1. A01EM81

      Connect the 3 connectors.

    2. A01EKYW

      Engage the 2 claws to temporarily install the power distribution as shown in the illustration.

    3. Install the power distribution with the bolt.