GENERATOR INSTALLATION


  1. INSTALL GENERATOR ASSEMBLY


    1. A01ELME

      Install the generator with the 2 bolts.

      Torque:
      52 N*m  { 530 kgf*cm, 38 ft.*lbf }
    2. A01EJ6Z

      Install the wire harness clamp bracket with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Connect the generator wire with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    4. Install the terminal cap.

    5. Connect the generator connector.

  2. INSTALL WIRE HARNESS CLAMP BRACKET


    1. A01EL0K

      Install the clamp bracket with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Attach the wire harness clamp to the clamp bracket.

  3. INSTALL V-RIBBED BELT

    Tech Tips

    Click here

  4. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY


    1. A01EK9G

      Fit the 3 retainers and install the No. 1 engine cover sub-assembly.

  5. INSTALL COOL AIR INTAKE DUCT SEAL


    1. A01EJEH

      Install the cool air intake duct seal with the 12 clips.

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.