Click here

ДАТЧИК ДЕТОНАЦИИ УСТАНОВКА

Click here
Click here
  1. Click here

    INSTALL KNOCK SENSOR


    1. Install the 4 knock sensors with the 4 bolts so that the sensors are angled as shown in the illustration.

      20 N*m 204 kgf*cm 15 ft.*lbf
      Note:

      The acceptable installation angle of the knock control sensors is between 10° upwards and downwards from the horizontal position.

    2. Connect the 4 knock sensor connectors.

  2. Click here

    INSTALL SEPARATOR CASE


    1. Install the separator case with the 4 bolts.

      10 N*m 102 kgf*cm 7 ft.*lbf
  3. Click here

    REMOVE NO. 3 ENGINE COVER

  4. Click here

    REMOVE NO. 2 ENGINE COVER SUB-ASSEMBLY LH

  5. Click here

    INSTALL INTAKE MANIFOLD

    (Click here)