REAR UPPER ARM INSPECTION


  1. INSPECT REAR UPPER NO. 1 CONTROL ARM ASSEMBLY LH

    A01H1F6

    1. Temporarily install the nut, and flip the ball joint stud back and forth 5 times as shown in the illustration.

    2. Use a torque wrench to turn the nut continuously at a rate of 3 to 5 seconds per turn. Take the torque reading on the fifth turn.

      Standard turning torque
      3.5 N*m (36 kgf*cm, 31 in.*lbf) or less

      • If the value is not within the specified range, replace the No. 1 control arm with a new one.

    3. Check the dust boot for cracks and grease leakage.

  2. INSPECT REAR UPPER NO. 2 CONTROL ARM ASSEMBLY LH

    A01H0PC

    1. Temporarily install the nut, and flip the ball joint stud back and forth 5 times as shown in the illustration.

    2. Use a torque wrench to turn the nut continuously at a rate of 3 to 5 seconds per turn. Take the torque reading on the fifth turn.

      Standard turning torque
      9.0 N*m (92 kgf*cm, 80 in.*lbf) or less

      • If the value is not within the specified range, replace the No. 2 control arm with a new one.

    3. Check the dust boot for cracks and grease leakage.