CONTROL VALVE ASSEMBLY (for Front Side) INSTALLATION


  1. INSTALL NO. 1 HEIGHT CONTROL VALVE SUB-ASSEMBLY


    1. A01H129

      Install the height control valve with the 2 nuts.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    2. A01GZ5M

      Connect the 3 height control tubes (Type 1) Click here.

    3. A01H04J

      Connect the height control tube (Type 2) Click here.

    4. Connect the connector.

  2. INSPECT FOR AIR LEAK

    Click here

  3. INSTALL FRONT BUMPER COVER

    Click here