DESCRIPTION
With terminals 12 (TS) and 4 (CG) of the DLC3 connected, when the power switch is turned ON (IG), test mode will start and then the DTCs will be output.
WIRING DIAGRAM
INSPECTION PROCEDURE
Note
When replacing the skid control ECU, perform initialization of the linear solenoid valve calibration Click here.
PROCEDURE
INSPECT DLC3 (TS VOLTAGE)
Measure the voltage according to the value(s) in the table below.
| Standard voltage | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
CHECK HARNESS AND CONNECTOR (DLC3 - SKID CONTROL ECU AND BODY GROUND) Click here |
| OK |
|
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE Click here
CHECK HARNESS AND CONNECTOR (DLC3 - SKID CONTROL ECU AND BODY GROUND)
Disconnect the A21 skid control ECU connector.
Measure the resistance according to the value(s) in the table below.
| Standard resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Result | Proceed to |
|---|---|
| NG | A |
| OK (for LHD) | B |
| OK (for RHD) | C |
| B |
|
REPLACE SKID CONTROL ECU Click here |
| C |
|
REPLACE SKID CONTROL ECU Click here |
| A |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR