DESCRIPTION
When the air conditioning amplifier assembly is turned on, a magnet clutch assembly ON signal is sent from the MGC terminal of the air conditioning amplifier assembly. Then, the A/C COMP relay turns on to operate the magnet clutch assembly.
WIRING DIAGRAM
INSPECTION PROCEDURE
Note
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE
INSPECT MAGNET CLUTCH RELAY (A/C COMP)
Remove the A/C COMP relay from the engine room No. 1 relay block, junction block.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPLACE MAGNET CLUTCH RELAY (A/C COMP) |
| OK |
|
INSPECT COOLER COMPRESSOR ASSEMBLY
except 5L-E:
Remove the cooler compressor assembly (for 1GR-FE) Click here.
Remove the cooler compressor assembly (for 1KD-FTV) Click here.
Remove the cooler compressor assembly (for 2TR-FE) Click here.
Disconnect the A magnet clutch connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
for 5L-E:
Remove the cooler compressor assembly Click here.
Disconnect the A magnet clutch connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | Proceed to |
|---|---|
| OK | A |
| NG (for 1GR-FE) | B |
| NG (for 1KD-FTV) | C |
| NG (for 5L-E) | D |
| NG (for 2TR-FE) | E |
| B |
|
REPLACE COOLER COMPRESSOR ASSEMBLY Click here |
| C |
|
REPLACE COOLER COMPRESSOR ASSEMBLY Click here |
| D |
|
REPLACE COOLER COMPRESSOR ASSEMBLY Click here |
| E |
|
REPLACE COOLER COMPRESSOR ASSEMBLY Click here |
| A |
|
INSPECT MAGNET CLUTCH ASSEMBLY
except 5L-E:
Reconnect the A magnet clutch connector.
Apply battery voltage to the magnet clutch assembly and check the operation of the magnet clutch assembly.
| OK | ||||
|---|---|---|---|---|
|
for 5L-E:
Reconnect the A magnet clutch connector.
Apply battery voltage to the magnet clutch assembly and check the operation of the magnet clutch assembly.
| OK | ||||
|---|---|---|---|---|
|
| Result | Proceed to |
|---|---|
| OK | A |
| NG (for 1GR-FE) | B |
| NG (for 1KD-FTV) | C |
| NG (for 5L-E) | D |
| NG (for 2TR-FE) | E |
| B |
|
REPLACE MAGNET CLUTCH ASSEMBLY Click here |
| C |
|
REPLACE MAGNET CLUTCH ASSEMBLY Click here |
| D |
|
REPLACE MAGNET CLUTCH ASSEMBLY Click here |
| E |
|
REPLACE MAGNET CLUTCH ASSEMBLY Click here |
| A |
|
CHECK HARNESS AND CONNECTOR (ENGINE ROOM NO. 1 RELAY BLOCK, JUNCTION BLOCK - BATTERY)
| *1 | A/C COMP Relay |
| *a | Component without relay installed (Engine Room No. 1 Relay Block, Junction Block) |
Remove the A/C COMP relay from the engine room No. 1 relay block, junction block.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER - BATTERY)
| *a | Front view of wire harness connector (to Air Conditioning Amplifier Assembly) |
Disconnect the G25 amplifier connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (ENGINE ROOM NO. 1 RELAY BLOCK, JUNCTION BLOCK - COOLER COMPRESSOR)
Remove the A/C COMP relay from the engine room No. 1 relay block, junction block.
Disconnect the C39*1 or C113*2 compressor connector.
*1: except 5L-E
*2: for 5L-E
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
|||||||||
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here