DESCRIPTION
This circuit consists of the integration control and panel assembly and air conditioning amplifier assembly. When the integration control and panel assembly is operated, signals are transmitted to the air conditioning amplifier assembly through the LIN communication system.
If the LIN communication system malfunctions, the air conditioning amplifier assembly does not operate when the integration control and panel assembly is operated.
WIRING DIAGRAM
INSPECTION PROCEDURE
Note
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE
CHECK HARNESS AND CONNECTOR (INTEGRATION CONTROL AND PANEL - AIR CONDITIONING AMPLIFIER)
Disconnect the G25 amplifier connector.
Disconnect the G23 panel connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (INTEGRATION CONTROL AND PANEL - BATTERY AND BODY GROUND)
| *a | Front view of wire harness connector (to Integration Control and Panel Assembly) |
Disconnect the G23 panel connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
REPLACE INTEGRATION CONTROL AND PANEL ASSEMBLY
Replace the integration control and panel assembly with a new or normally functioning one Click here.
Operate the integration control and panel assembly to check that it functions properly.
| OK |
|---|
| Integration control and panel assembly operates normally. |
| NG |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here |
| OK |
|
END (INTEGRATION CONTROL AND PANEL ASSEMBLY IS FAULTY)