COMBINATION METER INSTALLATION

Click here
Click here Click here
Tip:
  • Use the same procedure for RHD and LHD vehicles.

  • The procedure listed below is for LHD vehicles.

Click here
  1. Click here

    INSTALL COMBINATION METER ASSEMBLY


    1. Connect the 2 connectors.

    2. Install the combination meter assembly with the 4 screws.

  2. Click here

    INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY


    1. Connect the connector.

    2. Attach the 2 clips and 2 guides.

    3. Attach the 4 claws.

    4. Attach the 4 claws to install the instrument cluster finish panel sub-assembly.

  3. Click here

    INSTALL LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY


    1. Connect each connector.

    2. Attach the 4 clips to install the instrument panel finish panel.

  4. Click here

    INSTALL INSTRUMENT PANEL FINISH PLATE GARNISH (for RHD)


    1. Connect each connector.

    2. Attach the 4 clips to install the instrument panel finish plate garnish.

  5. Click here

    INSTALL INSTRUMENT CLUSTER FINISH PANEL ORNAMENT (for LHD)


    1. Attach the 3 clips to install the instrument cluster finish panel ornament.

  6. Click here

    CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

  7. Click here

    RESTORE AUTOAWAY/RETURN FUNCTION (for Power Tilt and Power Telescopic Steering Column)


    1. Restore the Autoaway/Return function setting to the previous condition by changing the customize parameter (Click here).